Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
United States
California
Contra Costa County
Concord

Iron Horse Trail junction – Iron Horse Trail bridge loop from Concord

Routes
Road cycling routes
United States
California
Contra Costa County
Concord

Iron Horse Trail junction – Iron Horse Trail bridge loop from Concord

Moderate

5.0

(5610)

10,150

riders

Iron Horse Trail junction – Iron Horse Trail bridge loop from Concord

02:55

59.8km

170m

Road cycling

Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.

Last updated: July 10, 2026

Waypoints

A

Start point

Train Station

Get Directions

1

5.75 km

Contra Costa Canal / Ygnacio Canal Trail junction

Highlight • Trail

Strategic trail junction of these two excellent, flat, paved, car-free trail systems

Tip by

2

10.4 km

Iron Horse Trail junction

Highlight • Cycleway

Crossing of two of the best East Bay flat bike trails, one following a former rail line, the other an old canal that still transports municipal water.

Tip by

3

13.8 km

Iron Horse Trail

Highlight (Segment) • Cycleway

The Iron Horse Trail is a 32-mile multi-path that connects the towns of Concord and Pleasanton. It follows the route of the abandoned Southern Pacific Railroad. With its access to …

Tip by

4

23.8 km

Museum of the San Ramon Valley

Highlight • Historical Site

The Museum of the San Ramon Valley was established in 1985 and sits in a restored 1891 Southern Pacific Railroad Depot with the Victorian-era “Combination Station No. 22” listed on …

Tip by

5

24.1 km

Iron Horse Trail

Highlight (Segment) • Trail

Wide well paved flat biking trail following a former rail line along the San Ramon Valley from Pleasanton via Dublin and Walnut Creek to Concord.

Tip by

6

35.4 km

Iron Horse Trail

Highlight (Segment) • Trail

The Iron Horse Trail is a 32-mile multi-use path that connects Concord to Pleasanton, following the old route of the Southern Pacific Railroad; established in 1891 and abandoned in 1977. …

Tip by

7

51.2 km

Iron Horse Trail bridge

Highlight • Bridge

The old railway bridge crosses Walnut Creek and continues its service to the bikers and pedestrians along the Iron Horse Regional Trail.

Tip by

8

53.5 km

Exceptionally well-built bike infrastructure, with a wide, gradually rising bridge that allows an almost effortless crossing above the busy intersection.

Tip by

B

59.8 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

54.6 km

3.82 km

1.24 km

147 m

< 100 m

Surfaces

46.1 km

13.5 km

157 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (140 m)

Lowest point (10 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Saturday 11 July

32°C

12°C

0 %

Additional weather tips

Max wind speed: 17.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Hard

4.7

440

Elmwood to Tilden Regional Park

02:30h

46.2km

940m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy