Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
United States
Massachusetts
Hampshire County
Belchertown

Norwottuck Rail Trail Bridge – Norwottuck Rail Trail Bridge loop from Belchertown

Routes
Road cycling routes
United States
Massachusetts
Hampshire County
Belchertown

Norwottuck Rail Trail Bridge – Norwottuck Rail Trail Bridge loop from Belchertown

Moderate

2.6

(3)

78

riders

Norwottuck Rail Trail Bridge – Norwottuck Rail Trail Bridge loop from Belchertown

02:45

63.7km

450m

Road cycling

Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.

Last updated: July 2, 2026

Waypoints

A

Start point

Bus stop

Get Directions

7.58 km

Mount Holyoke Range State Park

Nature Reserve

2

10.4 km

Bay Road

Highlight (Segment) • Cycleway

Bay Road is a quiet country road that makes for great road biking. It's surrounded by countryside the entire time and is mostly flat.

Tip by

16.9 km

Hadley Water Department Land

Nature Reserve

4

24.0 km

Norwottuck Rail Trail Bridge

Highlight • Bridge

The Norwottuck Rail Trail Bridge carried the Boston-Maine Railroad across the Connecticut River. The steel bridge opened in 1887 and carried trains for many decades. In 1992, it re-opened as …

Tip by

5

25.8 km

Norwottuck Rail Trail (Francis P. Ryan Section)

Highlight (Segment) • Cycleway

The Norwottuck Branch Rail Trail is an 11-mile paved, multi-use trail that runs from Northampton, through Hadley and Amherst, to Belchertown, Massachusetts. This particular section of the trail runs from …

Tip by

6

30.8 km

Look Memorial Park

Highlight • Rest Area

Look Memorial Park was established in memory of Frank Newhall Look. His wife, Fannie, gifted land and development funds for the park. The park opened to the public in 1930.

Tip by

7

38.6 km

Norwottuck Rail Trail Bridge

Highlight (Segment) • Bridge

Take the cycling trail from Union Station out of Northampton instead of the busy road used in the route!

Tip by

8

44.9 km

The Norwottuck Rail Trail is a part of an extensive network of connecting multi-use paths connecting the towns of Amherst, Belchertown, Easthampton, Florence, Hadley, Southampton, and Williamsburg. This section of …

Tip by

9

49.9 km

Fort River Bridge

Highlight • Bridge

This bridge along the Norwottuck Rail Trail crosses the Fort River and offers great views of the waterway.

Tip by

10

56.6 km

Topping Farm Conservation Area

Highlight • Forest

With forests, brooks, swamps, meadows, and wetlands, the Topping Farm Conservation Area really is a haven for the plants and animals that call the property their home. A few different …

Tip by

B

63.7 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

32.5 km

18.2 km

9.14 km

3.96 km

Surfaces

59.3 km

3.92 km

547 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Monday 6 July

21°C

17°C

66 %

Additional weather tips

Max wind speed: 13.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Easy

5.0

76

Mass Central Rail Trail: Norwottuck Branch

01:58h

49.3km

200m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy