Wolf River Trail System – Shelby Farms Greenline loop from Farm Train Station
Wolf River Trail System – Shelby Farms Greenline loop from Farm Train Station
4.6
(7517)
12,329
riders
03:05
37.7km
110m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: June 15, 2026
Tips
Includes a segment in which cycling is not permitted
After 35.7 km for 98 m
Waypoints
Start point
Train Station
Get Directions
1.85 km
Highlight • Forest
Tip by
8.42 km
Highlight (Segment) • Cycleway
Tip by
15.1 km
Highlight (Segment) • Trail
Tip by
18.2 km
Highlight • Trail
Tip by
23.9 km
Highlight (Segment) • Cycleway
Tip by
35.3 km
Highlight • Forest
Tip by
35.8 km
Highlight • Forest
Tip by
37.7 km
End point
Train Station
Way Types & Surfaces
Way Types
21.9 km
12.8 km
2.18 km
654 m
215 m
Surfaces
21.5 km
6.94 km
6.89 km
2.43 km
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Friday 24 July
31°C
22°C
42 %
Additional weather tips
Max wind speed: 9.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free