Pila railroad station – Hydroelectric Power Plant on the Gwda loop from Piła Główna
Pila railroad station – Hydroelectric Power Plant on the Gwda loop from Piła Główna
9
riders
02:43
46.7km
200m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: August 15, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 108 m for 1 m
After 46.7 km for 1 m
Waypoints
Start point
Train Station
Get Directions
118 m
Highlight • Monument
Translated by Google •
Tip by
24.1 km
Highlight • Bridge
24.3 km
Highlight • Bridge
24.5 km
Highlight • Bridge
Translated by Google •
Tip by
42.7 km
Highlight • Monument
Translated by Google •
Tip by
45.1 km
Highlight • Historical Site
Translated by Google •
Tip by
45.8 km
Highlight • Monument
Translated by Google •
Tip by
46.6 km
Highlight • Rest Area
Translated by Google •
Tip by
46.7 km
End point
Train Station
Way Types & Surfaces
Way Types
21.2 km
13.8 km
6.56 km
4.53 km
636 m
< 100 m
Surfaces
17.9 km
11.9 km
11.5 km
3.26 km
1.98 km
261 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (130 m)
Lowest point (60 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Tuesday 1 September
21°C
12°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free