Footbridge over the Notec Canal – New Section of the Bike Path loop from gmina Szubin
Footbridge over the Notec Canal – New Section of the Bike Path loop from gmina Szubin
16
riders
01:45
40.7km
140m
Road cycling
Moderate road ride. Great for any fitness level. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: October 16, 2026
Tips
Includes a segment in which cycling is not permitted
After 39.5 km for 67 m
Waypoints
Start point
Bus stop
1.26 km
Highlight • Settlement
22.0 km
Highlight • Bridge
Translated by Google •
Tip by
25.2 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
39.5 km
Highlight • Restaurant
40.7 km
End point
Bus stop
Way Types & Surfaces
Way Types
23.2 km
9.14 km
7.27 km
1.22 km
Surfaces
32.7 km
5.60 km
1.41 km
1.03 km
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Friday 23 October
14°C
6°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.