Bridge Over the Liwiec River – Liwiec River loop from Wyszków
Bridge Over the Liwiec River – Liwiec River loop from Wyszków
4.0
(1)
6
riders
01:56
27.6km
80m
Mountain biking
Moderate mountain bike ride. Great for any fitness level. Advanced riding skills necessary. The starting point of the route is accessible with public transport.
Last updated: August 23, 2026
Tips
Cycling is not permitted along parts of this route
After 0 m for 243 m
After 27.4 km for 243 m
Waypoints
Start point
Train Station
7.01 km
Highlight • Structure
Translated by Google •
Tip by
7.34 km
Highlight (Segment) • Trail
Translated by Google •
Tip by
12.3 km
Highlight • Bridge
Translated by Google •
Tip by
12.3 km
Highlight • River
Translated by Google •
Tip by
17.5 km
Highlight • Structure
Translated by Google •
Tip by
17.7 km
Highlight • Religious Site
Translated by Google •
Tip by
27.6 km
End point
Train Station
Way Types & Surfaces
Way Types
8.97 km
7.41 km
4.39 km
3.31 km
2.64 km
500 m
442 m
Surfaces
10.4 km
9.65 km
6.28 km
881 m
397 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Thursday 22 October
13°C
5°C
33 %
Additional weather tips
Max wind speed: 14.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.