Froggy Castle BSD – Alam Sutera Archway loop from Lebak Bulus Bank Syariah Indonesia
Froggy Castle BSD – Alam Sutera Archway loop from Lebak Bulus Bank Syariah Indonesia
5.0
(1)
94
riders
04:20
75.1km
300m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: March 27, 2026
Tips
Includes a segment that goes up or down a series of steps
You may need to carry your bike.
After 44.1 km for 32 m
Waypoints
Start point
Train Station
Get Directions
12.3 km
Highlight • Cycleway
Tip by
14.3 km
Highlight • Trail
Tip by
17.2 km
Highlight (Segment) • Cycleway
35.3 km
Highlight • MTB Park
Tip by
41.4 km
Highlight • Monument
Tip by
44.3 km
Highlight • Structure
53.6 km
Highlight • Monument
Tip by
75.1 km
End point
Train Station
Way Types & Surfaces
Way Types
32.2 km
27.0 km
14.7 km
771 m
483 m
< 100 m
Surfaces
63.3 km
10.7 km
577 m
398 m
159 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 21 May
35°C
26°C
95 %
Additional weather tips
Max wind speed: 8.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.