Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
United States
New Hampshire
Merrimack County
Concord

Tory Hill – Contoocook Covered Bridge loop from Broad Cove City Forest

Routes
Road cycling routes
United States
New Hampshire
Merrimack County
Concord

Tory Hill – Contoocook Covered Bridge loop from Broad Cove City Forest

Hard

2.6

(8)

63

riders

Tory Hill – Contoocook Covered Bridge loop from Broad Cove City Forest

03:36

74.2km

1,030m

Road cycling

Hard road ride. Very good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is right next to a parking lot.

Last updated: May 18, 2026

Tips

Temporary access restrictions

Includes segments with temporary access restrictions.

After 38.6 km for 10.1 km

Closed: • during snow conditions (otherwise open)

Waypoints

A

Start point

Parking

Get Directions

1

6.06 km

Rail Trail Bridge over Contoocook River

Highlight • Bridge

This section of the former Concord to Claremont rail line crosses the Contoocook River at this point. The line is now a scenic trail and passes through the quiet woodlands of Mast Yard State Forest.

Tip by

2

33.1 km

Tory Hill

Highlight • Summit

43.6 km

Mount Kearsarge State Forest

Nature Reserve

4

69.9 km

Contoocook Covered Bridge

Highlight • Bridge

This bridge actually sees a lot of traffic from cyclists crossing back and forth over the pretty, tranquil Contoocook River — and some vehicle drivers too, of course.

Tip by

B

74.2 km

End point

Parking

Loading

Way Types & Surfaces

Way Types

70.7 km

2.95 km

618 m

Surfaces

73.6 km

672 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (740 m)

Lowest point (110 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Wednesday 15 July

28°C

18°C

-- %

Additional weather tips

Max wind speed: -- km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Description

If you're seeking a genuinely challenging road cycling adventure, the Tory Hill – Contoocook Covered Bridge loop from Broad Cove City Forest delivers. This difficult 46.1-mile (74.2 km) route packs a significant punch with 3377 feet (1029 metres) of elevation gain, typically taking around 3 hours and 35 minutes to complete. It's a fantastic option for experienced cyclists looking for a rewarding workout on some of the more demanding Broad Cove City Forest road cycling routes.

What to expect on Tory Hill – Contoocook Covered Bridge loop from Broad Cove City Forest

This route is a journey of sustained effort, particularly as you ascend towards Tory Hill. While specific viewpoints aren't detailed, the satisfaction of conquering the climbs is a reward in itself. The ride then transitions, leading you towards the historic Contoocook Covered Bridge, a notable landmark that offers a scenic break from the intensity. This advanced road cycling Tory Hill loop is best suited for riders who thrive on long, challenging ascents and are confident in their ability to manage a difficult course.

Planning your visit

The route begins from Broad Cove City Forest, which is a convenient starting point for this loop. Parking at Broad Cove City Forest Henniker NH is generally available, but it's always wise to arrive earlier on pleasant days to secure a spot, especially if you're planning to spend a full day cycling. Remember to carry ample water and nutrition for this demanding ride, as services might be sparse along the route. The best time of year for Tory Hill Contoocook Covered Bridge cycling is typically spring through fall, avoiding winter conditions.

Trail details

  • Distance: 46.1 miles (74.2 km)
  • Elevation gain: 3377 feet (1029 metres)
  • Difficulty: difficult
  • Estimated time: 3 hours and 35 minutes

Nearby routes

Easy

4.8

22

White Farm and Whittier Pond loop

00:57h

22.8km

180m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy