Workhouse Bridge – Stone Canal Lock and Bridge loop from Stone
Workhouse Bridge – Stone Canal Lock and Bridge loop from Stone
21
runners
00:42
6.68km
30m
Running
Moderate run. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: September 24, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions. Check ahead to confirm restricted segments are open to the public.
After 5.34 km for 266 m
Waypoints
Start point
Bus stop
480 m
Highlight • Viewpoint
Tip by
1.13 km
Highlight • River
1.27 km
Highlight • Cycleway
Tip by
1.49 km
Highlight • Bridge
Tip by
1.81 km
Highlight • Structure
Tip by
1.94 km
Highlight • Bridge
Tip by
2.71 km
Highlight • Structure
Tip by
3.49 km
Highlight • Bridge
Tip by
6.68 km
End point
Bus stop
Way Types & Surfaces
Way Types
2.88 km
2.83 km
667 m
317 m
Surfaces
3.30 km
2.55 km
475 m
344 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Monday 23 November
7°C
-1°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.