83
riders
06:41
120km
1,400m
Road cycling
Hard road ride. Very good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: June 25, 2026
Tips
Includes a segment in which cycling is not permitted
After 80.0 km for 240 m
Waypoints
Start point
Train Station
Get Directions
2.03 km
成城みつ池
Forest
21.4 km
Highlight • Religious Site
Translated by Google •
Tip by
46.4 km
Highlight • Mountain Pass
Translated by Google •
Tip by
56.8 km
Lake Sagami
Lake
67.4 km
Highlight • Mountain Pass
Tip by
80.1 km
小田野城跡
Ruins
120 km
End point
Train Station
Way Types & Surfaces
Way Types
64.0 km
26.9 km
18.2 km
9.00 km
1.51 km
661 m
Surfaces
86.7 km
30.2 km
2.32 km
1.06 km
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (700 m)
Lowest point (20 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Sunday 6 September
27°C
22°C
99 %
Additional weather tips
Max wind speed: 33.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free