Gotemba Trailhead – Fujikan Mountain Hut (3,700m) loop from Gotemba New 5th Station
Gotemba Trailhead – Fujikan Mountain Hut (3,700m) loop from Gotemba New 5th Station
4.7
(7)
81
hikers
09:33
18.3km
2,260m
Hiking
Hard hike. Very good fitness required. Easily walkable paths. The starting point of the route is accessible with public transport.
Last updated: October 15, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
富士箱根伊豆国立公園
Waypoints
Start point
Bus stop
70 m
Highlight • Trail
Tip by
3.62 km
Highlight (Segment) • Viewpoint
Tip by
5.08 km
Highlight • Mountain Hut
Tip by
9.74 km
Highlight • Mountain Hut
Showing Translation
Tip by
9.79 km
Highlight • Religious Site
Tip by
12.2 km
Highlight • Mountain Hut
Tip by
17.3 km
Highlight • Mountain Hut
18.3 km
End point
Bus stop
Way Types & Surfaces
Way Types
18.2 km
< 100 m
< 100 m
< 100 m
Surfaces
9.81 km
8.41 km
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Wednesday 11 November
11°C
4°C
0 %
Additional weather tips
Max wind speed: 4.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.