RoutesPlannerFeaturesUpdates
App
Login or Signup
Get the App
Login or Signup
Routes
Mountain biking trails
Poland
Masovian Voivodeship
Legionowo
gmina Serock

Beach Wieliszew – Dębe Hydroelectric Power Plant loop from Izbica

Routes
Mountain biking trails
Poland
Masovian Voivodeship
Legionowo
gmina Serock

Beach Wieliszew – Dębe Hydroelectric Power Plant loop from Izbica

Easy

5.0

(1)

5

riders

Beach Wieliszew – Dębe Hydroelectric Power Plant loop from Izbica

01:21

20.1km

70m

Mountain biking

Easy mountain bike ride. The starting point of the route is accessible with public transport.

Last updated: October 8, 2026

Tips

Includes a segment in which cycling is not permitted

After 10.6 km for 107 m

Waypoints

A

Start point

Bus stop

Get Directions
1

9.52 km

Zegrze South (PKP)

Highlight • Rest Area

Good connections from Warsaw to Zegrze, although you need to check the timetable carefully, because not every train goes there. Some end earlier.

Translated by Google •

Tip by

2

10.6 km

Pier in Rybaki

Highlight • Structure

There are a few of them, heavily overgrown and they look unused.
On the other hand, they are suitable for a moment of relaxation :-)

Showing Translation

Tip by

3

12.3 km

Not bad. If there are no people, you can get a good average on the top of the embankment. And if there are people... it's a shame to talk...

Translated by Google •

Tip by

4

15.4 km

Beach Wieliszew

Highlight • Beach

In winter, you can observe walruses playing in Narew 😉

Translated by Google •

Tip by

5

17.1 km

6

17.2 km

Dębe Hydroelectric Power Plant

Highlight • Structure

Hydroelectric power plant on the water stage in Lake Zegrze.

Translated by Google •

Tip by

7

17.5 km

Dębe Dam

Highlight • Monument

A dam damming water with a power plant

Translated by Google •

Tip by

8

17.7 km

Dębe Hydroelectric Power Plant

Highlight • Monument

The main devices of the power plant are four turbine sets with Kaplan turbines with a rotor diameter of 4.8 m coupled to generators with a power of 6.25 MVA. The installed capacity of the plant is 20 MW and the average annual production is 91 GWh. The power plant is connected to the National Power System with five lines with a voltage of 110 kV through two block transformers with a capacity of 16 MVA each. The dam creates a water barrage 5.5 meters high.

Source:
pl.wikipedia.org/wiki/Elektrownia_Wodna_D%C4%99be

Translated by Google •

Tip by

B

20.1 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

8.84 km

4.76 km

3.36 km

2.19 km

868 m

156 m

Surfaces

6.50 km

4.79 km

4.54 km

2.54 km

1.19 km

612 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation
Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Sunday 8 November

5°C

-5°C

0 %

Additional weather tips

It’s going to be cold. Wrap up warm and watch out for ice.

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save
Edit route
Download GPX
Move start point
Print
Share
Embed on a website
Report an Issue
Report restricted access

Nearby routes

Easy

4.9

74

Jablonowska Cross Route

01:14h

15.2km

20m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy