Forest Entrance – Footbridge over the Żerański Canal loop from Legionowo Przystanek
Forest Entrance – Footbridge over the Żerański Canal loop from Legionowo Przystanek
4.8
(27)
168
riders
02:09
36.9km
70m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: September 10, 2026
Tips
Includes a segment in which cycling is not permitted
After 691 m for 61 m
Waypoints
Start point
Train Station
731 m
Highlight • Bridge
3.30 km
Highlight • Structure
Translated by Google •
Tip by
5.34 km
Highlight • Forest
Tip by
13.8 km
Highlight • Rest Area
Translated by Google •
Tip by
16.4 km
Highlight • Cycleway
Translated by Google •
Tip by
16.5 km
Highlight • Bridge
Translated by Google •
Tip by
16.8 km
Highlight • Rest Area
Translated by Google •
Tip by
19.4 km
Highlight • Bridge
Translated by Google •
Tip by
36.9 km
End point
Train Station
Way Types & Surfaces
Way Types
25.9 km
8.64 km
1.11 km
951 m
401 m
Surfaces
26.8 km
8.19 km
987 m
919 m
129 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Friday 30 October
10°C
4°C
66 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.