Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Road cycling routes
Poland
powiat kołobrzeski
Kołobrzeg

Port of Mrzezyno – Bridge Over the Drzewny Canal loop from Kołobrzeg Stadion

Routes
Road cycling routes
Poland
powiat kołobrzeski
Kołobrzeg

Port of Mrzezyno – Bridge Over the Drzewny Canal loop from Kołobrzeg Stadion

Moderate

51

riders

Port of Mrzezyno – Bridge Over the Drzewny Canal loop from Kołobrzeg Stadion

02:35

54.3km

130m

Road cycling

Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.

Last updated: February 23, 2026

Tips

Includes a segment in which cycling is not permitted

After 34.5 km for 64 m

Waypoints

A

Start point

Train Station

Get Directions

1

114 m

Kołobrzeg Stadion Railway Platform

Highlight • Rest Area

Railway station platform at the Kotwica Kołobrzeg stadium.
If someone wants to go straight west from Kołobrzeg, it is better to get off here than at the main station

Translated by Google •

Tip by

2

2.91 km

The Monument to the Victims of the NKVD Anti-Polish Operation 1937-1938 and the Extermination of the Nadberezyńców commemorates a forgotten crime - genocide of over 100,000 Poles, inhabitants of the USSR

Translated by Google •

Tip by

3

34.4 km

Port of Mrzezyno

Highlight • Structure

View of the harbor wall. At this place are some places for camping cars available. Inkl power connection. Great place to camp. In the harbor you can take various meals.

Translated by Google •

Tip by

4

43.9 km

A picturesque ride on a wooden footbridge

Translated by Google •

Tip by

5

44.0 km

The bike path that leads through the dune is beautifully designed and a little adventure, especially for children.

Translated by Google •

Tip by

6

47.3 km

Prawdziwe Kafe

Highlight (Segment) • Cafe

dw who

Translated by Google •

Tip by

7

54.0 km

Bridge Over the Drzewny Canal

Highlight • Bridge

The Drzewny Canal is a three-kilometer long river branch of the Parsęta, starting in Budzistowo and running through Kołobrzeg to the sea port, where it joins the waters of the Parsęta.

Translated by Google •

Tip by

B

54.3 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

29.6 km

18.5 km

3.44 km

2.63 km

< 100 m

< 100 m

< 100 m

Surfaces

40.1 km

7.51 km

4.61 km

2.00 km

117 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Thursday 21 May

17°C

10°C

0 %

Additional weather tips

Max wind speed: 19.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

4.5

325

Bridge Over the Drzewny Canal – Walrus in Gąski loop from Kołobrzeg Stadion

03:04h

67.8km

140m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy