Mount Henry Bridge – Canning Bridge loop from Murdoch
Mount Henry Bridge – Canning Bridge loop from Murdoch
5.0
(1)
112
riders
02:32
61.2km
160m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: October 8, 2026
Tips
Includes a segment in which cycling is not permitted
After 45.9 km for 112 m
Waypoints
Start point
Train Station
3.68 km
Highlight • Bridge
Tip by
4.26 km
Beach
Beach
4.51 km
Highlight (Segment) • Cycleway
Tip by
5.83 km
Canning River
Lake
10.3 km
Milyu Nature Reserve
Nature Reserve
40.7 km
Highlight • Monument
Tip by
41.0 km
Highlight • Monument
Tip by
45.9 km
Highlight • Viewpoint
Tip by
47.2 km
Highlight • Cafe
48.5 km
Highlight • Viewpoint
54.3 km
Highlight • Bridge
Tip by
61.2 km
End point
Train Station
Way Types & Surfaces
Way Types
47.9 km
4.35 km
2.81 km
2.63 km
2.41 km
1.11 km
< 100 m
Surfaces
51.5 km
9.39 km
304 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Thursday 22 October
18°C
9°C
87 %
Additional weather tips
Max wind speed: 29.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.