Mount Henry Bridge – Canning Bridge loop from Murdoch
Mount Henry Bridge – Canning Bridge loop from Murdoch
12
riders
04:05
94.8km
220m
Road cycling
Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: June 20, 2026
Tips
Cycling is not permitted along parts of this route
After 20.8 km for 188 m
After 21.8 km for 283 m
Waypoints
Start point
Train Station
Get Directions
3.68 km
Highlight • Bridge
Tip by
5.75 km
Highlight (Segment) • Cycleway
Tip by
7.28 km
Highlight • Bridge
Tip by
10.9 km
Milyu Nature Reserve
Nature Reserve
13.2 km
Highlight • Viewpoint
18.6 km
Highlight • Bridge
Tip by
21.3 km
Highlight • Monument
Tip by
21.6 km
Highlight • Monument
Tip by
22.4 km
Highlight • Bridge
Tip by
89.1 km
Canning River
Lake
90.7 km
Beach
Beach
94.8 km
End point
Train Station
Way Types & Surfaces
Way Types
80.7 km
7.89 km
4.34 km
1.41 km
477 m
< 100 m
< 100 m
Surfaces
67.5 km
26.9 km
514 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 12 July
18°C
4°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free