Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
Australia
Western Australia

Mount Henry Bridge – Canning Bridge loop from Murdoch

Routes
Road cycling routes
Australia
Western Australia

Mount Henry Bridge – Canning Bridge loop from Murdoch

Moderate

12

riders

Mount Henry Bridge – Canning Bridge loop from Murdoch

04:05

94.8km

220m

Road cycling

Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.

Last updated: June 20, 2026

Tips

Cycling is not permitted along parts of this route

After 20.8 km for 188 m

After 21.8 km for 283 m

Waypoints

A

Start point

Train Station

Get Directions

1

3.68 km

Mount Henry Bridge

Highlight • Bridge

Mount Henry Bridge is a major road bridge that crosses the Canning River as part of Kwinana Freeway. Opened in 1986, the bridge was one of the longest incrementally launched …

Tip by

2

5.75 km

The Esplanade

Highlight (Segment) • Cycleway

The Esplanade is a riverside road and shared path that runs along the Canning River foreshore in the suburb of Mount Pleasant. The route follows a flat stretch of riverfront …

Tip by

3

7.28 km

Canning Bridge

Highlight • Bridge

Canning Bridge is a major road bridge that carries Canning Highway across the Canning River between the suburbs of Applecross and Como. Originally built in the 1930s, this key bridge …

Tip by

10.9 km

Milyu Nature Reserve

Nature Reserve

5

13.2 km

6

18.6 km

Boorloo Bridge

Highlight • Bridge

Watch out for walkers and runners who encroach into the cycle lanes. It can get hairy!

Tip by

7

21.3 km

Optus Stadium

Highlight • Monument

The premier sports stadium in Australia

Tip by

8

21.6 km

Optus Stadium

Highlight • Monument

Circuit the stadium and cross the bridge

Tip by

9

22.4 km

Windan Bridge

Highlight • Bridge

Windan Bridge carries traffic, cyclists, and pedestrians across the Swan River between East Perth and Burswood. Opened in 2000 as part of the Graham Farmer Freeway, the bridge includes a …

Tip by

89.1 km

Canning River

Lake

90.7 km

Beach

Beach

B

94.8 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

80.7 km

7.89 km

4.34 km

1.41 km

477 m

< 100 m

< 100 m

Surfaces

67.5 km

26.9 km

514 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Sunday 12 July

18°C

4°C

-- %

Additional weather tips

Max wind speed: -- km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Moderate

4.5

739

Nice View – Canning Bridge loop from Daglish

02:31h

53.7km

270m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy