Mass Central Rail Trail – Thayer Pond WMA loop from Houghton Elementary parking
Mass Central Rail Trail – Thayer Pond WMA loop from Houghton Elementary parking
3.1
(16)
67
riders
04:19
72.4km
670m
Gravel riding
Hard gravel ride. Very good fitness required. Mostly paved surfaces. The starting point of the route is right next to a parking lot.
Last updated: November 25, 2026
Tips
Your route passes through protected areas
Please check local regulations for:
Rutland State Park
Ware River Watershed
Waypoints
Start point
Parking
25.8 km
Highlight • Lake
Tip by
26.4 km
Highlight • Natural
Tip by
26.5 km
Highlight (Segment) • Cycleway
Tip by
35.7 km
Highlight (Segment) • Waterfall
Tip by
36.5 km
Highlight • Monument
Tip by
43.3 km
Highlight • Forest
Tip by
44.2 km
Highlight (Segment) • Trail
Tip by
45.8 km
Highlight • Lake
Tip by
72.4 km
End point
Parking
Way Types & Surfaces
Way Types
21.6 km
20.9 km
19.0 km
10.6 km
246 m
Surfaces
26.6 km
22.6 km
16.9 km
4.97 km
1.41 km
Sign up to see more specific route details
Sign up for freeElevation
Highest point (360 m)
Lowest point (120 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Friday 27 November
13°C
3°C
96 %
Additional weather tips
It’s set to rain on your activity. Pack a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.