Kolej na Rower Bike Path – Stany Railway Bridge loop from Zielona Góra Główna
Kolej na Rower Bike Path – Stany Railway Bridge loop from Zielona Góra Główna
5.0
(26)
140
riders
03:44
62.3km
230m
Intermediate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: August 11, 2025
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
16 m in total
Waypoints
Start point
Train Station
Get Directions
6.10 km
Highlight (Segment) • Cycleway
11.0 km
Highlight • Rest Area
Translated by Google •
Tip by
11.0 km
Highlight • Rest Area
Translated by Google •
Tip by
18.6 km
Highlight • Cycleway
26.6 km
Highlight • Cycleway
Translated by Google •
Tip by
30.9 km
Highlight • Bridge
Translated by Google •
Tip by
31.5 km
Highlight • Bridge
Translated by Google •
Tip by
37.4 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
62.3 km
End point
Train Station
Way Types & Surfaces
Way Types
52.9 km
4.41 km
2.49 km
2.03 km
309 m
< 100 m
Surfaces
53.7 km
3.79 km
2.94 km
1.37 km
404 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Today
Tuesday 28 October
10°C
8°C
70 %
If you start your activity now...
Max wind speed: 25.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.