Bridge over the Nabão River – Republic Square, Tomar loop from Tomar
Bridge over the Nabão River – Republic Square, Tomar loop from Tomar
5
riders
02:30
41.2km
460m
Mountain biking
Moderate mountain bike ride. Good fitness required. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 9, 2026
Tips
Cycling is not permitted along parts of this route
After 39.2 km for 272 m
After 39.5 km for 84 m
Waypoints
Start point
Train Station
Get Directions
39.0 km
Highlight • Bridge
Translated by Google •
Tip by
39.1 km
Highlight • Bridge
39.1 km
Highlight (Segment) • Settlement
Translated by Google •
Tip by
39.5 km
Highlight • Settlement
39.5 km
Highlight • Monument
Tip by
39.9 km
Highlight • Forest
Translated by Google •
Tip by
40.0 km
Highlight • Monument
40.3 km
Highlight • Settlement
Translated by Google •
Tip by
41.2 km
End point
Train Station
Way Types & Surfaces
Way Types
25.5 km
8.53 km
5.39 km
1.05 km
715 m
Surfaces
34.7 km
5.17 km
737 m
568 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (360 m)
Lowest point (50 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 17 May
21°C
9°C
0 %
Additional weather tips
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.