komoot
  • Routes
  • Route planner
  • Features
  • Product updates
Discover
Places to see

Germany

Lower Saxony

Lüneburg Heath

Celle

Hambühren

Oldau Lock and Historic Hydroelectric Power Station

Discover
Places to see

Germany

Lower Saxony

Lüneburg Heath

Celle

Hambühren

Oldau Lock and Historic Hydroelectric Power Station

Oldau Lock and Historic Hydroelectric Power Station

Cycling Highlight

Recommended by 611 out of 644 cyclists

See rides here
  • Take Me There
  • Suggest an Edit
Loading

Location: Hambühren, Celle, Lüneburg Heath, Lower Saxony, Germany

Top cycling routes to Oldau Lock and Historic Hydroelectric Power Station

Tips

  • In 1907, the Royal Prussian State decided the channeling of the Aller on a route between Celle and the Leineeinmündung at Hademstorf. The town of Celle was given the right to use the hydroelectric power generated by the dam. The usable slope is 2.80 meters. After completion, the hydroelectric power plant went on 16 April 1911 to the grid. 1929 was equipped with three Francis turbines Oldau hydroelectric power plant sold to the Preußen Elektra and operated by this until 1972. Following temporary closure, the imminent demolition by the district president in Lüneburg was prohibited and the facility declared a technical monument.

    After a ten-year shutdown, the hydroelectric power plant was put back into operation. The annually produced electricity of about 2.5 to 3 million kilowatt hours is fed into the power grid. The Oldau hydroelectric power station is the only one of its kind that has been preserved in its original condition in Germany and supplies electricity to the grid.

    translated byGoogle
    • December 1, 2016

  • Beautiful continuation forest and meadow area for horses. Even foals are born here. 😍

    translated byGoogle
    • August 12, 2018

  • Barrage Oldau


    Construction period from 1912 to 1914
     
    Usable length 165 m
     
    Usable width 10 m (gate width)
     
    Drumming height 2.50 m
     
    total capacity approx. 9,200 cubic meters
     
    Capacity per lock process approx. 6,200 cubic meters
     
    Filling time approx. 15 min
     
    Rounds 2 pieces per 2.70 square meters
     
    Average flow approx. 3.5 m cubic meters / s per cycle
     
    Lock locks on upper and lower stay gates
     
    Drive the gates electric drive
     
    Drive of the circulation locks E-drive
     
    O.W. (Upstream) NN + 32.80 m
     
    U.W. (Underwater) approx. NN +30.00 m
     
    Sole NN +27,10 m

    translated byGoogle
    • December 2, 2016

Sign up for a free komoot account to get 42 more insider tips and takes.

See rides here
Loading

Location: Hambühren, Celle, Lüneburg Heath, Lower Saxony, Germany

Most Visited During

  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec

Weather on route - Hambühren

Loading