Weiher III was put into operation in 1976 after a three-year construction period and was Saarbergwerke AG's largest construction project. The flue gas desulphurization system was the largest in Europe at the time when it was commissioned. Today only Block III remains, the older power plants were decommissioned and demolished in 1973 (I) and 1999/2001 (II). In 2006 the output was increased from 680 MW to 697 MW through retrofitting.