The Interchange Spiral Bike Ramp
The Interchange Spiral Bike Ramp
Highlight • Bridge
Cycling
4.7
(15)
The Interchange Spiral Bike Ramp is a distinctive and innovative piece of urban infrastructure located in Stockport, Greater Manchester, United Kingdom. Rising to an elevation of 49 meters, this eye-catching 189-meter-long spiral bridge forms a vital link within the new Stockport Interchange development. It seamlessly connects the rooftop Viaduct Park with the Transport Interchange, the town center, and the scenic River Mersey, offering a unique pathway for active travel.
Visitors consistently praise the ramp's clever design and its enjoyable user…
Tips
August 5, 2024
Cycling

In the know? Log-in to add a tip for other adventurers!
Nearby routes
Best routes near The Interchange Spiral Bike Ramp

5.0
(1)
23
riders
42.5km
02:33
250m
250m
Moderate bike ride. Good fitness required. Mostly paved surfaces.

4.5
(4)
12
riders
21.9km
01:20
110m
110m
Easy bike ride. Mostly paved surfaces.

11
riders
42.9km
02:32
210m
210m
Moderate bike ride. Good fitness required. Mostly paved surfaces.
Details
Informations
Elevation 50 m
Weather
Powered by Foreca
Today
Sunday 22 November
8°C
3°C
0 %
Additional weather tips
Expect light wind and shifting conditions.
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December
Location: Greater Manchester, North West England, England, United Kingdom
The Interchange Spiral Bike Ramp serves as a crucial link within Stockport. It connects the new rooftop Viaduct Park with the Transport Interchange, the wider town center, and the River Mersey frontage. This integration provides seamless access to the Trans Pennine Trail and facilitates travel to the railway station.
Yes, absolutely. The ramp was specifically designed with an accessible 1:21 gradient, never exceeding 5%. This gentle slope makes it suitable for all users, including very young children on bikes or scooters, those with limited mobility, and wheelchair users, ensuring a safe and easy experience for everyone.
While there isn't dedicated parking specifically for the ramp itself, visitors can utilize the parking facilities available at the Stockport Interchange or other public car parks within the town center. The ramp is designed to integrate with multi-modal transport, so arriving by bus or train to the Interchange is also a convenient option.
The ramp is 189 meters long. Due to its gentle gradient, the time it takes to traverse depends on your pace. Cyclists can typically ride it in a minute or two, while pedestrians might take a few minutes to walk its length, enjoying the views as they go.
As a popular new urban feature, the ramp can get busy, especially during peak commuting hours and on sunny weekend afternoons. For a quieter experience, consider visiting during weekday mornings or later in the evenings. The integrated LED lighting ensures it's well-lit and safe for use after dark.
The ramp features an anti-slip surface covering, making it safe to use in most weather conditions. However, like any outdoor structure, it can be exposed to rain and wind. Cyclists and pedestrians should always exercise caution, especially during wet or icy conditions, and dress appropriately for the weather.
Yes, being part of the Stockport Interchange and connecting directly to the town center, there are numerous cafes, restaurants, and shops within easy walking distance. You'll find a variety of options for refreshments and meals before or after using the ramp.
The spiral design itself offers unique photographic angles. As you ascend or descend, you'll get changing perspectives of the River Mersey, the surrounding urban landscape, and the impressive architecture of the Interchange. It's a great spot for capturing modern urban design and connectivity.
Yes, the ramp is designed to integrate with the broader Bee Network cycling and walking infrastructure and the Trans Pennine Trail. This connectivity makes it an excellent starting or ending point for various circular routes, allowing cyclists to explore Stockport and its riverfront areas. You can find several such routes on komoot.
The spiral ramp was unveiled in January 2022 as part of the larger £1 billion Stockport Interchange Mixed Use development, aimed at regenerating the town center. It officially opened in June 2024, connecting the town center to the riverfront for the first time in generations, funded by the City Region Sustainable Transport Settlement (CRSTS) and the Active Travel Fund.