Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Germany
Saxony-Anhalt
Wittenberg
Anhalt-Bitterfeld
Muldestausee

Muldestausee Hydroelectric Power Plant

Muldestausee Hydroelectric Power Plant

Recommended by 15 mountain bikers

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Mountain Biking Routes to Muldestausee Hydroelectric Power Plant

    4.6

    (24)

    77

    riders

    1. Boat harbor – View of Lake Goitzsche loop from Bitterfeld

    29.0km

    01:44

    110m

    110m

    Intermediate mountain bike ride. Great for any fitness level. Advanced riding skills necessary.

    Navigate

    Send to Phone

    Intermediate

    Intermediate mountain bike ride. Good fitness required. Advanced riding skills necessary.

    Intermediate

    Intermediate mountain bike ride. Good fitness required. Advanced riding skills necessary.

    Intermediate

    Tips

    July 5, 2024

    [February 21, 2023] A hydroelectric power plant has now been put into operation at the Mulde reservoir. In the future, it will generate 13.6 million kilowatt hours per year.

    In the Anhalt-Bitterfeld district, a newly built hydroelectric power plant has now officially been put into operation at the Mulde reservoir. According to the state of Saxony-Anhalt, the plant at the outlet structure of the dam will generate around 13.6 million kilowatt hours (kWh) of electricity per year in the future and can therefore cover the energy needs of around 4,000 households in the region. The Mulde reservoir is a former open-cast mining pit that was flooded in the mid-1970s when the Mulde was relocated. With an area of around 6.3 square kilometers and around 135 million cubic meters of reservoir water, it is the third largest body of water in the country. Around 25 million euros were invested in the construction of the hydroelectric power plant; Construction began in October 2016.

    The hydroelectric power plant at the Mulde reservoir is operated by Talsperren-Wasserkraft Sachsen-Anhalt (TSW), a subsidiary of the Saxony-Anhalt Dam Company. In total, TSW operates five hydroelectric power plants in the state, which generate almost 19 million kWh of electricity annually. Another plant is currently being installed at the Rappbode Dam, which is expected to supply an additional six million kWh per year in the future. (th)

    Source stadt-und-werk.de/meldung_40658_Start+von+Wasserkraftanlage.html

    Translated by Google •

      In the know? Log-in to add a tip for other adventurers!

      Sign up for free

      Details

      Informations

      Elevation 90 m

      Weather

      Powered by AerisWeather

      Today

      Wednesday 8 October

      16°C

      13°C

      0 %

      If you start your activity now...

      Max wind speed: 7.0 km/h

      Most visited during

      January

      February

      March

      April

      May

      June

      July

      August

      September

      October

      November

      December

      Loading

      Location: Muldestausee, Anhalt-Bitterfeld, Wittenberg, Saxony-Anhalt, Germany

      Other Popular Places to Check Out

      Explore
      RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
      Download the app
      Follow Us on Socials

      © komoot GmbH

      Privacy Policy