Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
United Kingdom
England
West Midlands Region
Worcestershire
Wyre Forest
Bewdley

Wyre Forest Line Railway Path

Wyre Forest Line Railway Path

Recommended by 18 hikers

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Best Hikes to Wyre Forest Line Railway Path

    5.0

    (19)

    122

    hikers

    1. Knowles Mill – Bewdley Riverside Promenade loop from Catchems End

    17.6km

    04:41

    160m

    160m

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Navigate

    Send to Phone

    Intermediate

    4.8

    (11)

    50

    hikers

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Intermediate

    Intermediate hike. Good fitness required. Easily-accessible paths. Suitable for all skill levels.

    Intermediate

    Tips

    January 14, 2023

    The ‘Wyre Forest Line’ formed a connection between the SVR at Bewdley and the Shrewsbury and Hereford Railway (S&HR) at Woofferton. The route encompassed two railways, the Tenbury Railway and the Tenbury & Bewdley Railway.

    Following the completion of the Tenbury & Bewdley Railway in 1864, the GWR took over the working of traffic over the Tenbury Railway section on behalf of the joint companies, with the LNWR also having running powers. As part of this process, the GWR telegraph system was extended to Woofferton; also the LNWR agreed to a turntable being installed at Tenbury to be paid for by the GWR. This turntable was moved from Bewdley and re-erected in the goods yard at Tenbury. (Some confusion has occurred in the past, as there was a small wagon turntable at Woofferton in its early days.) The completed line ran north from the GWR station at Bewdley on a single line track alongside the Severn Valley Line for a distance of about a mile before diverging to the west to cross the river Severn at Dowles Bridge (the viaduct referred to by Capt. Tyler), the remains of which are visible from trains on the SVR. The abutments where the line passed over what is now the B4194 remain in-situ. The line continued to Woofferton via Wyre Forest, Cleobury Mortimer, Neen Sollars, Newnham Bridge, Tenbury (later renamed Tenbury Wells) and Easton Court.

    The route acquired a number of names. A platform sign at Woofferton station referred to 'The Bewdley Branch', while passengers at Bewdley could take 'The Tenbury Branch'. Informally the route was often referred to as 'The Wyre Forest Line' or 'The Tenbury Line'. The Engineer's Line References were TBY for 'Tenbury & Bewdley' and WTW for 'Woofferton and Tenbury Wells', while the 1905 Ordnance Survey map describes it as the 'GW&L&NW Joint Railway - Woofferton & Tenbury' and the 'GWR - Tenbury & Bewdley Branch'

    One purpose of the Tenbury & Bewdley Railway was for freight traffic to gain access to the expanding markets of the West Midlands. However at the time of opening, this journey would require traveling to the SVR's southern terminus at Hartlebury, with a reversal to reach the West Midlands via Kidderminster. This was hampered by a lack of siding space at Hartlebury and resulted in frequent delays, leading to construction of the 'Kidderminster Loop Line' from Bewdley to Kidderminster. After the GWR built 'The Loop', the majority of services from Stourbridge and Kidderminster to Bewdley continued on the Wyre Forest Line.

    In January 1869, ownership of the Tenbury Railway was transferred jointly to the LNWR and GWR. It nominally remained an independent company until nationalisation in January 1948. The Tenbury & Bewdley Railway ceased to exist as a separate company when ownership was transferred to the GWR in February 1870. Both the GWR and the Tenbury Railway became part of British Railways' Western Region after nationalisation.

    In 1908 the Cleobury Mortimer and Ditton Priors Light Railway opened. This connected with the Tenbury & Bewdley Railway at Cleobury Mortimer and ran as a spur for 12½ miles to Ditton Priors.

      In the know? Log-in to add a tip for other adventurers!

      Sign up for free

      Details

      Informations

      Elevation 70 m

      Weather

      Powered by AerisWeather

      Today

      Friday 10 October

      15°C

      9°C

      0 %

      If you start your activity now...

      Max wind speed: 5.0 km/h

      Most visited during

      January

      February

      March

      April

      May

      June

      July

      August

      September

      October

      November

      December

      Loading

      Location: Bewdley, Wyre Forest, Worcestershire, West Midlands Region, England, United Kingdom

      Other Popular Places to Check Out

      Explore
      RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
      Download the app
      Follow Us on Socials

      © komoot GmbH

      Privacy Policy