Hiking Highlight
Recommended by 17 out of 19 hikers
Renovation of Corazza Park, Salsomaggiore Terme, 2006The park project is characterized by the internal diagonal path branching off from the already built ramp and the presence of a continuous edge at the edge of the street areas. Today the park seems far from the paths that lead from the Terme Zoja towards the historic center; The park with its redesign becomes the central element for intersections: the connection between the compact district and the spa center. The route identifies an important rest area that can be recognized in a central area characterized by a consolidated tree system that represents a circular figure as a special place for entertainment activities. Another important element of the project is the pedestrian connection between the two contiguous green spaces Parco Corazza and Parco Mazzini.
January 1, 2024
In the know? Log-in to add a tip for other adventurers!