The Falkenberg tunnel is a 2623 meter long railway tunnel between the Laufach train station and the Heigenbrücken stop on the Main-Spessart Railway. It was built from 2014 to 2016 as part of the re-routing of the Spessart ramp with two tunnels.
July 31, 2021
With the decommissioning of the Spessartrampe and the Schwarzkopf tunnel on June 15, 2017, the 163-year history of the old Heigenbrücken station came to an end.A shorter route with only a slightly reduced gradient (21 instead of 21.7 per thousand) has been gradually put into operation since June 19, 2017.From June 15 to 19, 2017, the new Spessartrampe was linked to the existing network as part of a total closure and the new Heigenbrücken stop was put into operation.Source: de.wikipedia.org/wiki/Spessartrampe