Road Cycling Highlight (Segment)
Vehicle locked. The asphalt NOW NEW ASPHALT AND IN TOP CONDITION 11.2021); RR dream.
April 17, 2020
The section through the forest, which was previously in great need of repair, has now finally been re-asphalted. Now everything is going smoothly and this route is really fun. In connection with the new cycle path between Neuried and Gauting, additional route options are now available, especially if you are on the road with a racing bike and do not like to be shaken and want to drive on main roads.
November 20, 2021
With the new asphalt, it's a dream that inline skaters are increasingly discovering. But the first 150 m from the south are still gravel with potholes. The rest is now a cycle highway. I like it best in the opposite direction - i.e. coming from Buchendorf. There is a pleasant incline that can be mastered very quickly.
April 21, 2022
In the know? Log-in to add a tip for other adventurers!
Our Tour recommendations are based on thousands of activities completed by other people on komoot.