Locomotion No. 1 Mural – Goosepool Beck Bridge loop from Stockton
Locomotion No. 1 Mural – Goosepool Beck Bridge loop from Stockton
4.0
(1)
8
riders
01:55
34.6km
130m
Easy mountain bike ride. Great for any fitness level. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: November 20, 2025
Tips
Cycling is not permitted along parts of this route
You'll need to dismount and push your bike.
After 937 m for 161 m
After 28.9 km for 50 m
After 34.4 km for 58 m
Waypoints
Start point
Train Station
Get Directions
838 m
Highlight • Structure
Tip by
13.1 km
Highlight • Other
34.6 km
End point
Train Station
Way Types & Surfaces
Way Types
15.0 km
11.2 km
5.99 km
1.40 km
932 m
101 m
< 100 m
Surfaces
23.7 km
9.88 km
584 m
513 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Tuesday 16 December
7°C
1°C
12 %
If you start your activity now...
Max wind speed: 11.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.