Arch Bridge with Murals – Glenoe Waterfall loop from Jordanstown
Arch Bridge with Murals – Glenoe Waterfall loop from Jordanstown
13
riders
02:29
53.0km
580m
Intermediate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.
Last updated: August 28, 2025
Tips
The surface for a segment of your route may not be suitable
Some segments of your route comprise a surface that may not be suitable for your chosen sport.
154 m in total
Waypoints
Start point
Train Station
Get Directions
2.44 km
Highlight • Bridge
23.3 km
Highlight • Viewpoint
Tip by
27.8 km
Glynn River
Lake
53.0 km
End point
Train Station
Way Types & Surfaces
Way Types
45.9 km
3.68 km
1.82 km
1.32 km
153 m
< 100 m
< 100 m
Surfaces
51.1 km
1.38 km
397 m
135 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Sunday 26 October
12°C
10°C
0 %
If you start your activity now...
Max wind speed: 18.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.