Morzeczyn Pier on Lake Miedwie – Viaduct Over the S10 loop from Pszczelnik
Morzeczyn Pier on Lake Miedwie – Viaduct Over the S10 loop from Pszczelnik
3
riders
02:26
32.6km
90m
Intermediate gravel ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: August 8, 2025
Waypoints
Start point
Bus stop
Get Directions
2.87 km
Highlight • Bridge
Translated by Google •
Tip by
7.02 km
Highlight • Lake
7.29 km
Highlight (Segment) • Trail
Translated by Google •
Tip by
9.08 km
Highlight • Monument
Translated by Google •
Tip by
20.4 km
Highlight • Religious Site
Translated by Google •
Tip by
20.5 km
Highlight • Historical Site
Translated by Google •
Tip by
23.2 km
Highlight • Bridge
Translated by Google •
Tip by
25.6 km
Highlight • Rest Area
Translated by Google •
Tip by
32.6 km
End point
Bus stop
Way Types & Surfaces
Way Types
13.8 km
7.60 km
5.77 km
5.45 km
< 100 m
Surfaces
14.7 km
14.4 km
2.30 km
626 m
460 m
126 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Today
Monday 3 November
11°C
8°C
100 %
If you start your activity now...
Max wind speed: 6.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.