Dom Zameiro Bridge – Water mills on the Rio Ave loop from ISMAI
Dom Zameiro Bridge – Water mills on the Rio Ave loop from ISMAI
6
riders
03:40
50.1km
600m
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: November 5, 2025
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
34 m in total
Waypoints
Start point
Train Station
Get Directions
2.03 km
Highlight • Trail
Translated by Google •
Tip by
5.32 km
Highlight • Historical Site
Tip by
8.68 km
Highlight • Religious Site
20.2 km
Highlight • Bridge
Translated by Google •
Tip by
20.3 km
Highlight • Structure
Translated by Google •
Tip by
35.9 km
Highlight • Bridge
50.1 km
End point
Train Station
Way Types & Surfaces
Way Types
22.4 km
12.3 km
8.46 km
3.29 km
3.18 km
307 m
127 m
Surfaces
19.1 km
15.4 km
11.9 km
2.99 km
688 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by AerisWeather
Today
Tuesday 18 November
17°C
9°C
0 %
If you start your activity now...
Max wind speed: 10.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.