Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Discover
Places to see
Netherlands
Limburg
Stein

Drained Julianakanaal Construction Site

Discover
Places to see
Netherlands
Limburg
Stein

Drained Julianakanaal Construction Site

Highlight • Structure

Drained Julianakanaal Construction Site

Recommended by 46 cyclists out of 57

Save

Share

  • More

  • Save

    Share

  • More

  • Take Me There

    Routes here

    Top cycling routes to Drained Julianakanaal Construction Site

    5.0

    (1)

    6

    riders

    1. Clevers Ice Cream Parlor – Schippershuis Urmond loop from Oud-Urmond

    12.8km

    00:45

    30m

    30m

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Navigate

    Send to Phone

    Easy

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Easy

    Easy bike ride. Great for any fitness level. Mostly paved surfaces. Suitable for all skill levels.

    Easy

    Tips

    October 8, 2024

    The Julianakanaal is being widened and deepened so that larger ships can pass through. In order to be able to dig, the water has to be drained. A dam is being built just south of the bridge over the canal at Berg aan de Maas. From here to the lock in Born, the canal is then drained. But first, the fish have to be removed. They are caught and transferred. Then the section of canal between the dam and the lock can be emptied. By opening the lock at Born slightly, the water flows north. This is done in small steps, so that not too much water flows out at once. Otherwise, bridges and quays downstream could be damaged. Then the digging can begin. Some 120 dumpers and excavators will get to work on this. A road is even being built on the bottom of the canal to remove all the material. After a few months, the digging work and the new dikes are finished. Then the water is pumped up again from behind the lock. When the level is good again, the dam can be demolished and the canal will reopen. According to the planning in April 2025. After that, ships up to 190 meters long, more than 11 meters wide and 3.5 meters deep will also be able to pass through the canal.

    Translated by Google •

      March 10, 2025

      it is possible until the beginning of April, after that it will be just one of the many canals in the Netherlands again

      Translated by Google •

        April 6, 2025

        Too late, already full again but certainly nice to cycle past

        Translated by Google •

          Sign up for a free komoot account to get 2 more insider tips and takes.

          Sign up for free

          Details

          Informations

          Elevation 60 m

          Weather

          Powered by AerisWeather

          Today

          Sunday 23 November

          5°C

          4°C

          70 %

          If you start your activity now...

          Max wind speed: 18.0 km/h

          Most visited during

          January

          February

          March

          April

          May

          June

          July

          August

          September

          October

          November

          December

          Loading

          Location: Stein, Limburg, Netherlands

          Other Popular Places to Check Out

          Oude Maas

          Explore
          RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepacking
          Download the app
          Follow Us on Socials

          © komoot GmbH

          Privacy Policy