About Uwe Rinka
306 km
73:29 h
Recent Activity
March 4, 2024
Super interesting hike
Translated by Google •
November 14, 2023
The tunnel has two lanes and is approximately 2 km long. We got in at the tunnel construction site in the south, where the Weinstrasse L 508 meets the B 38, walked as far as possible in the main tunnel and then in the escape tunnel and got out again north where the Kurtalstrasse B 427 meets the L 429
Translated by Google •
October 7, 2024
Beautiful hike
Translated by Google •
Sign up or log in to continue
Everything You Need To Get Outside
Ready-Made Inspiration
Browse personalized adventures tailored to your favorite sport
A Better Planning Tool
Build your perfect outdoor experience using the world’s best outdoor tech
More Intuitive Navigation
Turn-by-turn navigation and offline maps keep your adventure on track
A Log of Every Adventure
Save every adventure and share your experiences with your friends
Sign up or log in
Like