경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
독일
색스니 털실
어퍼 루사티아
바우첸
그로스하르타우

Historic Railway Bridge over the Wesenitz

Historic Railway Bridge over the Wesenitz

66명 중 63명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Historic Railway Bridge over the Wesenitz 하이킹

    4.6

    (7)

    29

    등산객

    1. Großharthau에서 출발하는 베제니츠강 – 그로스하르타우 성 공원 순환 코스

    6.56km

    01:45

    70m

    70m

    초급용 하이킹. 모든 체력 수준에 적합. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    탐색하기

    휴대폰으로 전송

    초급

    중급용 하이킹 투어. 좋은 체력 필요. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    중급

    초급용 하이킹. 모든 체력 수준에 적합. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    초급

    12월 31, 2021

    The history of the railway between Görlitz and Dresden began with a state treaty between Prussia and Saxony on July 24, 1843 on a cross-border railway line and the intended connection to the Lower Silesian-Märkische railway line from Görlitz to Kohlfurt. The state treaty contained the condition that the line be completed within four years. The Saxon-Silesian Railway Company, which had investment capital of six million thalers, was founded for the construction of the line. The Saxon government took a third of the company and obliged the company to build a branch line from Löbau to Zittau. [4]

    Timetable for the Dresden - Löbau section from December 17, 1846
    Construction began on May 10, 1844 from Dresden. On November 17, 1845, the first section to Radeberg was opened to traffic. Thanks to the rapidly progressing work, Bischofswerda followed on December 21, 1845, Bautzen on June 23, 1846 and December 17, 1846 with two passenger trains and one mail train to Löbau a day. [5]


    The inaugural train, which started in Bautzen on December 16, 1846, got stuck in a cut four kilometers behind Bautzen in heavy snow drifts near Rabitz. However, the brakeman who was sent to Bautzen first had to heat up a reserve locomotive, while the festival guests, who were stuck on the train, ran back to Bautzen. On the Prussian side, the earthworks at Reichenbach began in October 1845. Up to 800 men worked simultaneously on the breakthrough between Reichenbach and Gersdorf alone, but the snowy winter of 1846/1847 forced the work to stop. The test drive between Löbau and Reichenbach took place on April 29, 1847; the section was opened on July 1 of the same year.

    On September 1, 1847, the opening ceremony of the 102.2 kilometer long route from Görlitz to Dresden and the route from Görlitz to Kohlfurt took place.
    Source: Wikipedia

    번역자 Google •

      10월 3, 2022

      Lt. Komoot you can cross the Wesenitz here - unfortunately there is no bridge here. It's best to choose the "right" side at the castle park ;-)

      번역자 Google •

        12월 2, 2020

        The railway bridge was built between 1875 and 1880 and is now a listed building.

        번역자 Google •

          나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

          무료 회원 가입

          세부정보

          정보

          고도 310 m

          날씨

          AerisWeather 제공

          오늘

          수요일 15 10월

          12°C

          9°C

          0 %

          지금 활동을 시작하면...

          최고 풍속: 1.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:그로스하르타우, 바우첸, 어퍼 루사티아, 색스니 털실, 독일

          살펴봐야 할 유명한 장소

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책