The construction of the Ölhafen Bridge swings in a spiral path over the approximately 70 meters wide Raunheim oil port access. Since 2013 she closes the gap in the cycle …
The open space design of the Main foreland is the result of a competition won in 2011. Thanks to the sensitive approach to the history and topography …