Timeline
DNC planned a bike ride
January 9, 2025
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
December 30, 2024
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
December 28, 2024
Time
Distance
Speed
Ascent
Descent
DNC and BREVET SUR planned a bike ride
December 22, 2024
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
December 3, 2024
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
December 3, 2024
Time
Distance
Speed
Ascent
Descent
December 3, 2024
PCV1: Caipulli Bridge Km 42.0
PCV2: Crossroads Km 88.0
Translated by Google •
DNC planned a bike ride
December 3, 2024
Time
Distance
Speed
Ascent
Descent
pcorderokine likes this.
December 3, 2024
PCV 1: Werner Bridge Km 14.5
PCV 2: Crossing Km 57.5
PCV 3: Plaza Río Negro Km 89.0
Translated by Google •
DNC and BREVET SUR planned a bike ride
November 13, 2024
Time
Distance
Speed
Ascent
Descent
Jorgerodrigo likes this.
DNC planned a bike ride
November 12, 2024
Time
Distance
Speed
Ascent
Descent
December 3, 2024
PCV1: Cruce Huilma Km 21.0
Translated by Google •
BREVET SUR and DNC planned a bike ride
October 31, 2024
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
October 10, 2024
Time
Distance
Speed
Ascent
Descent
DNC planned a bike ride
August 6, 2024
Time
Distance
Speed
Ascent
Descent
July 22, 2024
3 Control Points
1.- Km 34.5 Tegualda (La Española Supermarket)
2.- Km 70.8 Corte Alto (Dalas Supermarket)
3.- km 90.3 Letters Plaza Río Negro
Translated by Google •
DNC planned a bike ride
August 5, 2024
Time
Distance
Speed
Ascent
Descent
July 22, 2024
5 Control Points
1.- Km 22 End of First Section of Gravel
2.- Km 57 Osorno Volcano Viewpoint
3.- Km 62.1 Centinela Beach
4.- Km 87.3 Start of the second Gravel Section
5.- Km 111 Letters Plaza Rio Negro
Translated by Google •
DNC planned a bike ride
August 5, 2024
Time
Distance
Speed
Ascent
Descent
July 22, 2024
3 Control Points
1.- Km 22 End of First Section Gravel
2.- Km 38.3 Start of Second Section Gravel
3.- Km 53.7 Letters Plaza Río Negro
Real Altimetry 1016 mt
Translated by Google •
DNC planned a bike ride
August 5, 2024
Time
Distance
Speed
Ascent
Descent
July 22, 2024
2 Control Points
1.- km 12.2 Wegner Bridge
2.- km 18.5 School Crossing (end of gravel road)
Real Altimetry 470 mt
Translated by Google •
December 3, 2024
PCV1: Huilma Junction Km 21.0
PCV2: Río Negro Plaza Km 39.0
Translated by Google •
Sign up or log in to continue
Everything You Need To Get Outside
Ready-Made Inspiration
Browse personalized adventures tailored to your favorite sport
A Better Planning Tool
Build your perfect outdoor experience using the world’s best outdoor tech
More Intuitive Navigation
Turn-by-turn navigation and offline maps keep your adventure on track
A Log of Every Adventure
Save every adventure and share your experiences with your friends