Timeline
Grummler went for a bike ride
March 31, 2021
Time
Distance
Speed
Ascent
Descent
March 31, 2021
Cycle route assessment:
The path is paved throughout, easy to drive on, school grades 2.
The paved path through the fields should only be equipped with the road sign 240 (common foot and cycle path to protect cyclists) with the addition - agricultural traffic free.
Translated by Google •
Grummler went for a bike ride
February 28, 2021
Time
Distance
Speed
Ascent
Descent
February 28, 2021
Photo 1) The bike path is much too narrow, especially on this route that goes up and down here, it is driven fast, with oncoming traffic it gets narrow. The width here should be at least 2.50 meters.
Image 2) Urgent repair or re-asphalt major damage to the road surface, sometimes large, deep holes! High
Translated by Google •
Grummler went for a bike ride
February 25, 2021
Time
Distance
Speed
Ascent
Descent
February 25, 2021
The path along the cemetery in Rommerskirchen should be paved.
Image 1) This path urgently needs to be renovated and paved.
Image 2) From the sports field to the L213 entrance, a cycle path is required or a speed limit of 30 km/h.
Image 3) The button for the traffic light not on the left side, but on the
Translated by Google •
Grummler went for a bike ride
February 4, 2021
Time
Distance
Speed
Ascent
Descent
February 4, 2021
Bike network BM - V15)
Suggestion for optimizing the bike route.
The V15) can generally be rated as good, at least from the underpass of the L213 to the pedestrian zone in Bergheim.
The asphalt path should only be equipped with the traffic sign 240 (common footpath and cycle path) with the addition - agricultural
Translated by Google •
Grummler went for a bike ride
November 10, 2020
Time
Distance
Speed
Ascent
Descent
November 10, 2020
Wheel network BM - V14.0)
Suggestion for optimizing the bike route.
A major renovation would do the Erft cycle path good, this affects the width and quality of the route.
School grade: 3
Translated by Google •
Grummler went for a bike ride
November 4, 2020
Time
Distance
Speed
Ascent
Descent
November 4, 2020
Proposal to optimize the cycle route
Start: traffic lights at the Kirchstraße junction.
Km 0: traffic lights should be switched as “green lights”, cycle lanes running at an acute angle lead onto the street “Am Knüchelsdamm”, mark cycle lanes beyond the crossing area with red color, set up a protected cycle
Translated by Google •
Grummler went for a bike ride
November 2, 2020
Time
Distance
Speed
Ascent
Descent
November 2, 2020
Cycle route assessment:
Behind Berrendorf, Heinrich-Doll-Straße, the path is in poor condition, up to the 1st intersection there are several thick roots under the asphalt, grade 4.
From the intersection school grades 2 minus to 3 minus.
Translated by Google •
March 31, 2021
V13.1)
Suggestion for optimizing the bike route.
Past the nursery is paved and easy to drive. School grades 2
Asphalt has to be paved behind the Stassen nursery. School grade: 5
Translated by Google •
Sign up or log in to continue
Everything You Need To Get Outside
Ready-Made Inspiration
Browse personalized adventures tailored to your favorite sport
A Better Planning Tool
Build your perfect outdoor experience using the world’s best outdoor tech
More Intuitive Navigation
Turn-by-turn navigation and offline maps keep your adventure on track
A Log of Every Adventure
Save every adventure and share your experiences with your friends