Rotas

Planejador

Funcionalidades

Atualizações

App

Entrar ou Criar conta

Baixe o App

Entrar ou Criar conta

Explorar
Places to see
Áustria
Baixa Áustria
Mostviertel
Bezirk Tulln
Zwentendorf no Danúbio

Usina Nuclear de Zwentendorf

Destaque • Monumento

Usina Nuclear de Zwentendorf

Recomendado por 18 caminhantes de 19

Guardar

Partilhar

  • Mais

  • Guardar

    Partilhar

  • Mais

  • Indicações para chegar lá

    Rotas aqui

    Os melhores Percursos de caminhada para Usina Nuclear de Zwentendorf

    4,4

    (7)

    34

    caminhantes

    1. Circuito Bärndorfer Hütte – Ponte pedonal sobre o rio (ponto de partida: Altenwörth)

    8,06km

    02:03

    20m

    20m

    Percurso de caminhada moderado. É necessário estar em boa forma. Trilhos acessíveis. Adequado a todos os níveis de experiência.

    Navegar

    Enviar para o telemóvel

    Moderada

    Trilho fácil. Ótimo para qualquer nível de forma física. Trilhos acessíveis. Adequado a todos os níveis de experiência.

    Fácil

    Percurso de caminhada moderado. É necessário estar em boa forma. Trilhos acessíveis. Adequado a todos os níveis de experiência.

    Moderada

    Sugestões

    18 de agosto de 2022

    Here you have a nice view of what is probably the safest nuclear power plant in the world.

    On April 4, 1972, the groundbreaking ceremony for the construction project "nuclear power plant Zwentendorf", which had been decided a year earlier by the general assembly of the joint nuclear power plant Tullnerfeld. On February 15, 1972, excavation began at the construction site. The cost of construction was around 8,466 million Schilling (1979) The type of nuclear power plant corresponded to a boiling water reactor. The bottleneck capacity was designed for 730 megawatts.
    In the summer of 1977, protest demonstrations also took place in Austria, strongly influenced by the opponents of nuclear power plants in West Germany. In the session of the National Council on July 7, 1978, a resolution was passed on a draft law which in any case bound the further use of nuclear energy to the approval of the National Council and provided for a referendum.
    The referendum of November 5, 1978 ended with a participation of around two-thirds of those eligible to vote with 50.5% against and 49.5% for the commissioning. In Zwentendorf, the majority of the population voted in favor of commissioning.

    Traduzido por Google •

      13 de maio de 2020

      Austrian contemporary history and a lesson in Austrian politics. Zwentendorf was the only nuclear power plant in the world to be completed, but never put into operation due to a referendum. Zwentendorf is a place that fascinates.
      The 1976 energy plan provided for the construction of a total of THREE nuclear power plants in Austria on the Danube. One should be in St. Pantaleon-Erla / St. Valentin will be erected on the border between Lower Austria and Upper Austria, for which the areas had already been purchased and another in the Eferdingen basin, where no specific location had yet been determined. A reactor should also be built in St. Andrä in Kärnten. Already in the 1960s, an area next to the Drava was designated for a nuclear power plant.
      As a result, the non-commissioning in December 1978 led to the Nuclear Non-Proliferation Act, according to which no nuclear power plants may be built in the future without a referendum. This law was tightened in 1999 by the Federal Constitutional Law for a Nuclear-Free Austria, which has constitutional status - since the Chernobyl disaster in 1986, anti-nuclear policy has been unanimous in society and in party politics.

      Traduzido por Google •

        22 de agosto de 2021

        Impressive when you think of the history of this building.

        Traduzido por Google •

          Regista-te gratuitamente no komoot para receberes mais 3 dicas e conselhos.

          Regista-te gratuitamente

          Detalhes

          Informações

          Elevação 180 m

          Previsão do Tempo

          Desenvolvido por AerisWeather

          Hoje

          terça-feira 4 novembro

          14°C

          3°C

          0 %

          Se você começar sua atividade agora...

          Velocidade máxima do vento: 7,0 km/h

          Mais visitado durante

          Janeiro

          Fevereiro

          Março

          Abril

          Mai

          Junho

          Julho

          Agosto

          Setembro

          Outubro

          Novembro

          Dezembro

          Loading

          Localização:Zwentendorf no Danúbio, Bezirk Tulln, Mostviertel, Baixa Áustria, Áustria

          Outros lugares que merecem uma visita

          AKW Zwentendorf

          Explorar
          RotasPlaneador de rotasFuncionalidadesCaminhadasTrilhas de MTBRotas de ciclismo de estradaBikepacking
          Baixe o aplicativo
          Siga-nos nas Redes Sociais

          © komoot GmbH

          Política de Privacidade