U-shift sea foam
Object data:
from October 1944 driving in Buntsandstein (code name Meerschaum)
planned 11 production tunnels, each 500 m long and 30000 m2 usable area, access via 2 tunnels
March 1945 Construction stopped, parts of a tunnel broken out
Connecting track to the Bad Blankenburg - Schwarza line, narrow-gauge transport railway
usage history
planned outsourcing of workshops at the torpedo arsenal in Mitte, Rudolstadt
Source: sachsenschiene.net