경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see

Canyons

독일
바이에른
스와비아
알고이
오스탈가우
호엔슈반가우

Marienbrücke (Bridge Over Pöllat Gorge)

Marienbrücke (Bridge Over Pöllat Gorge)

90명 중 87명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Marienbrücke (Bridge Over Pöllat Gorge) 투어

    4.9

    (74)

    501

    등산객

    1. Hohenschwangau에서 출발하는 브란더슈로펜 정상 – 노이슈반슈타인 성 전망 순환 코스

    14.3km

    06:59

    1,040m

    1,040m

    고급용 등산 경로. 우수한 체력 필요. 튼튼한 신발을 신고 미끄러지지 않게 조심해야 하며, 높은 산을 오른 경험이 있어야 함.

    탐색하기

    휴대폰으로 전송

    고급

    고급용 등산 경로. 우수한 체력 필요. 튼튼한 신발을 신고 미끄러지지 않게 조심해야 하며, 높은 산을 오른 경험이 있어야 함.

    고급

    고급용 등산 경로. 우수한 체력 필요. 대부분 갈 수 있는 길. 미끄러지지 않게 조심해야 함.

    고급

    9월 4, 2022

    Despite the large number of tourists, the view from the Marienbrücke to Neuschwanstein Castle and the Pöllat Gorge is very worthwhile! The bridge is open again!

    번역자 Google •

      8월 22, 2021

      Unfortunately blocked at the moment. August 2021.

      번역자 Google •

        7월 16, 2024

        In 1845, King Maximilian II had a wooden horse bridge built over the Pöllat. It was built using conventional wooden construction methods, but was probably not particularly stable, as it had to be replaced just a few years later. To increase the strength, a triple-layered beam construction with side supports was chosen, a construction that was not particularly aesthetically pleasing given its span of 35 meters.

        This was precisely the reason why King Ludwig II had this bridge replaced in 1866 by a delicate iron construction by the Gustavsburg workshops of the Maschinenbau-Gesellschaft Nürnberg, Klett & Comp. (now M.A.N.). During the construction of the Marienbrücke, a completely new construction method was successfully tested for the first time: Ninety meters above the Pöllatfall, the supports were erected by projecting the individual support sections from the anchors fixed in the rock on both sides, without any additional supporting armor.

        In 1984, the bridge was restored, and the supports had to be replaced. The railings have been preserved in their original state to this day.

        The Marienbrücke was closed at the beginning of August 2015 due to renovation work on the bridge's rock anchors. During the renovation, damage to the rock anchors was repaired and the coating of the metal structure and the wooden covering were renewed. The renovation costs amounted to around 650,000 euros. On August 4, 2016, the bridge was officially reopened by the district administrator of the Ostallgäu district and the Bavarian Finance Minister Markus Söder.

        From the beginning of 2021 to mid-2022, the Marienbrücke was closed because all rock anchors had to be replaced due to static problems.

        Source: hohenschwangau.de/natur-umgebung/marienbruecke-1

        번역자 Google •

          무료 komoot 계정을 만들고 4가지 특별한 팁과 여러 가지 유용한 정보를 더 많이 살펴보세요.

          무료 회원 가입

          세부정보

          정보

          고도 990 m

          날씨

          AerisWeather 제공

          오늘

          월요일 13 10월

          12°C

          5°C

          0 %

          지금 활동을 시작하면...

          최고 풍속: 4.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:호엔슈반가우, 오스탈가우, 알고이, 스와비아, 바이에른, 독일

          살펴봐야 할 유명한 장소

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책