경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
독일
노스라인-웨스트팔렌

Oberkasseler Brücke

하이라이트 • 다리

Oberkasseler Brücke

342명 중 320명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 Oberkasseler Brücke 하이킹

    4.8

    (72)

    584

    등산객

    1. Belsenplatz에서 출발하는 Schlossturm Düsseldorf – 부르크플라츠의 라인트레페 순환 코스

    12.3km

    03:09

    50m

    50m

    중급용 하이킹 투어. 좋은 체력 필요. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    탐색하기

    휴대폰으로 전송

    중급

    초급용 하이킹. 모든 체력 수준에 적합. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    초급

    초급용 하이킹. 모든 체력 수준에 적합. 실력과 관계없이 누구나 쉽게 갈 수 있는 길.

    초급

    6월 26, 2017

    The Oberkasseler bridge, although not in its present form, is the oldest of the Düsseldorf Rhine bridges for private transport. After the Hammer Railway Bridge, it is the second permanent bridge over the Rhine in Düsseldorf. The Oberkasseler bridge already had two predecessor buildings at the height of the old town, which were still constructed as ship bridges.

    번역자 Google •

      12월 12, 2020

      The most spectacular was the construction of the Oberkassel Bridge (1969-76). Because the important traffic artery could not be dispensed with during the construction of the new bridge, it was built parallel to the old Oberkassel bridge. April 1976 moved about 50 meters north to its current location.

      lokalkompass.de/duesseldorf/c-reisen-entzüge/die-duesseldorfer-bruecken-familie_a1231806

      번역자 Google •

        The Oberkassel Bridge, which belongs to the Düsseldorf bridge family, was opened to traffic in 1976. Like the other bridges in the bridge family, it is a cable-stayed bridge that appears dynamic and filigree due to its slim construction.
        The current bridge of the Theodor-Heuss-Brücke has a length of 614 meters, with a maximum span of 257 meters. The bridge is 35 meters wide and has 2 lanes in each direction of travel as well as a parallel pedestrian and bicycle path on the outside. A free-standing pylon with a height of 104 meters carries the steel cables from which the flat steel structure of the bridge beam is suspended. The bridge was built from October 1969 47 meters upstream of the already existing, temporary bridge in order to be able to maintain traffic during the construction period. In 1973 traffic was diverted to the new bridge and the temporary structure was torn down. In 1976, the entire Oberkassel bridge was moved 47 meters transversely to the location of the original bridge. The transverse displacement of the 12,700 ton bridge was carried out with hydraulic presses and took 12 hours and 47 minutes.

        Source: baukunst-nrw.de/objekte/Oberkasseler-Bruecke--319.htm

        번역자 Google •

          무료 komoot 계정을 만들고 4가지 특별한 팁과 여러 가지 유용한 정보를 더 많이 살펴보세요.

          무료 회원 가입

          세부정보

          정보

          고도 30 m

          날씨

          AerisWeather 제공

          오늘

          화요일 28 10월

          14°C

          10°C

          0 %

          지금 활동을 시작하면...

          최고 풍속: 20.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:노스라인-웨스트팔렌, 독일

          살펴봐야 할 유명한 장소

          Königsallee (Kö)

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책