경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see

오스트리아

로어 오스트리아

비엔나 우즈

바덴

쇼나우 안 데어 트리에스팅

Wiener Neustädter 운하 구간

디스커버
Places to see

오스트리아

로어 오스트리아

비엔나 우즈

바덴

쇼나우 안 데어 트리에스팅

Wiener Neustädter 운하 구간

Wiener Neustädter 운하 구간

85명이 추천한 장소입니다

95명 중 85명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    5월 15, 2016

    The construction of the Wiener Neustädter Canal began in 1797 and lasted until 1803. The repeatedly planned route Vienna-Trieste was never realized. 850 locks would have been needed and the construction time would have been 84 years.

    That would be a nice bike route .....

    번역자 Google •

      9월 22, 2019

      napp before implementation of the drainage, the Lower Austrian Chamber of Commerce intervened and acquired in the sense of several chamber members, the channel shares and all liabilities, but could not bear the conservation associated loads in the long run, as the aspired waterworks cooperative, which should take over the canal operation, did not materialize . [31] In 1956, the province of Lower Austria took over the southern part of the canal, the purchase agreement was concluded on 12 July 1956.

      That section, which was in the possession of the aircraft engine works, was largely dry even after the partial rehabilitation of the southern channel section, since the canal water in the area of community boundary Guntramsdorf-Laxenburg at the so-called "Haidbachablass" in the nearby Haidbach (Badener Mühlbach) was redirected. After the property rights to the aircraft engine works had been transferred to the "Industriezentrum Niederösterreich Süd GmbH" (IZ NÖ-Süd), the obligation enshrined in the original purchase agreement for the preservation of the canal was envisaged. In view of the massive destruction, especially in the northern part, there was a compromise after lengthy negotiations. The canal part to Mödlingbach was redeveloped in the early 1970s, but the section until the Krottenbach finally shut down. The channel section of the "IZ-Süd" became the property of the "ECO-Plus Betriebsführungsgesellschaften" in 2007.

      de.wikipedia.org/wiki/Wiener_Neust%C3%A4dter_Kanal

      번역자 Google •

        1월 16, 2023

        The path parallel to the canal is easy to navigate, the path is gravel but smooth.

        You often drive sheltered from the wind.

        번역자 Google •

          무료 komoot 계정을 만들고 2가지 특별한 팁과 여러 가지 유용한 정보를 더 많이 살펴보세요.

          무료 회원 가입

          세부정보

          정보

          거리 14.4 km

          오르막 30 m

          내리막 30 m

          날씨

          AerisWeather 제공

          오늘

          목요일 2 10월

          11°C

          4°C

          0 %

          지금 활동을 시작하면...

          최고 풍속: 13.0 km/h

          가장 많이 방문한 시기

          1월

          2월

          3월

          4월

          5월

          6월

          7월

          8월

          9월

          10월

          11월

          12월

          Loading

          위치:쇼나우 안 데어 트리에스팅, 바덴, 비엔나 우즈, 로어 오스트리아, 오스트리아

          살펴봐야 할 유명한 장소

          탐험하기
          ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
          앱 다운로드
          소셜 미디어에서 팔로우하기

          © komoot GmbH

          개인 정보 보호 정책