브레커펠트에는 둘러볼 만한 장소가 많답니다. 하이킹 또는 사이클링을 좋아한다면 브레커펠트에 숨겨진 20
가지 보석을 만날 수 있을 거예요. 이 지역의 주요 명소를 살펴보면서 다음 모험을 계획해보세요.
마지막 업데이트: 4월 8, 2026
하이라이트 • 다리
번역자 Google •
팁에 의해
하이라이트 (구간) • 다리
번역자 Google •
팁에 의해
이런 장소를 발견하려면 지금 가입하세요
최고의 싱글 트랙, 봉우리 및 다양한 흥미로운 야외 장소에 대한 추천을 받아보세요.
무료 회원 가입
하이라이트 • 전망대
번역자 Google •
팁에 의해
하이라이트 (구간) • 자전거 도로
번역자 Google •
팁에 의해
무료로 가입하여 브레커펠트 주변의 더 많은 명소를 발견하세요.
무료 회원 가입
이미 komoot 계정이 있나요?
오늘 무료 계정으로 시작하세요
다음 모험이 기다리고 있어요.
로그인 또는 가입하기
Ruhr Viaduct The Ruhr Viaduct in Herdecke is an impressive structure and a striking landmark of the Ruhr Valley. It is used by trains between Dortmund and Lüdenscheid. This imposing viaduct stretches over the Ruhr and also marks the beginning of the Ruhr reservoir Harkortsee Here are some interesting facts about the Ruhr Viaduct: Length: The viaduct is 313 meters long. Height: It rises to almost 30 meters above the river. Construction: 24,400 cubic meters of rubble stone and 12 arches with a span of 20 meters each were used for the construction. The bridge construction describes a slight curve with a radius of 380 meters in plan. History: In 1879, the line was inaugurated as part of the Düsseldorf-Derendorf–Dortmund South railway line (also known as the “Rheinische Strecke”) of the former Rhenish Railway Company. The construction of the viaduct in these dimensions was a technical masterpiece for the time. It made it possible to keep the length of the Ender Tunnel on the route as short as possible. Destruction: In May 1943, a pillar of the viaduct was torn away by the ensuing flood wave when the Möhne dam was destroyed by Operation Chastise. In 1945, two arches of the structure were blown up by the Wehrmacht. The viaduct was not rebuilt until 1952 and the first trains were able to cross it in 1957.https://ennepe-ruhr-entdecken.de/poi/ruhr-viadukt/
5
1
The Ruhr Viaduct in Herdecke spans the valley with a length of 313 m and 12 semi-circular arches, each with a span of 20 m.
6
0
Really nice view of the Ruhr Viaduct.
3
1
Fantastic bike path with great views
6
2
The tracks cross the river at a height of 30 meters and are 313 meters long; 24,400 cubic meters of quarry stone and 12 arches, each with a span of 20 meters, were required. The floor plan of the building describes a slight curve with a radius of 380 meters. The bridge route with the tracks on it has a gradient of 0.5 percent.
7
2
찾고 있는 하이라이트를 아직 못 찾으셨나요? 다른 지역의 주요 명소 가이드를 확인해보세요:
무료로 가입하기