Rotas

Planejador

Funcionalidades

Atualizações

App

Entrar ou Criar conta

Baixe o App

Entrar ou Criar conta

Explorar
Places to see
Polónia
Voivodia Masoviana
Sochaczew
Młodzieszyn

Ponte sobre o rio Bzura em Kamion

Ponte sobre o rio Bzura em Kamion

Recomendado por 16 ciclistas de estrada

Guardar

Partilhar

  • Mais

  • Guardar

    Partilhar

  • Mais

  • Indicações para chegar lá

    Rotas aqui

    Os melhores Percursos de ciclismo de estrada para Ponte sobre o rio Bzura em Kamion

    5,0

    (5)

    34

    ciclistas

    1. Circuito Igreja de Madeira em Kaliszki (ponto de partida: Nowy Dwór Mazowiecki)

    88,0km

    03:23

    150m

    150m

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. Superfícies pavimentadas e adequadas para bicicletas.

    Navegar

    Enviar para o telemóvel

    Moderada

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. O Percurso pode conter segmentos não pavimentados e difíceis para bicicletas.

    Moderada

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. Superfícies pavimentadas e adequadas para bicicletas.

    Moderada

    Sugestões

    7 de abril de 2025

    The first bridge over the Bzura in Kamion was built in 1915. It was a wooden structure of a temporary nature. After 9 years, the bridge was destroyed during the flood in 1924. It was rebuilt in the same year, but the ice embankments (elements protecting the bridge from flowing ice floes) were not made until the following year. The war that began in 1939 caused the destruction of five spans, which were later repaired by the Germans. Military operations in 1945 and the flowing ice floes in 1947 destroyed the bridge again, but in 1947 it was rebuilt by the State Road Bridge Reconstruction Directorate over the Vistula and Bzura near Wyszogród. In this form (during the last reconstruction it received steel girders) the bridge survived until 2010, when the flowing ice floes damaged it so much that vehicle traffic had to be significantly limited (to 3.5 tons and max. 2 m wide.

    The reconstruction, or rather construction from scratch, was carried out in the "Design and Build" system. It turned out to be necessary to rebuild the drainage, technical infrastructure devices and build traffic safety devices. The structure has four spans, is 160.5 m long and 9 m wide and has a load capacity that allows for the movement of vehicles weighing up to 80 tons.

    The contractor completed the work on October 30, 2012, while the ceremonial handover of the new bridge to the residents of Kamion and the Sochaczew district took place on January 2, 2013. The total cost of the works in Kamion amounted to PLN 14.7 million. The subsidy in the amount of PLN 6.8 million came from government funds for the removal of the effects of flooding, which was allocated by the Mazovian Voivode Jacek Kozłowski. The remaining funds in the amount of PLN 7.9 million were provided by the local government of the Mazovian Voivodeship.

    Traduzido por Google •

      Tens uma sugestão valiosa? Inicia sessão e partilha-a com os outros amantes de aventuras!

      Regista-te gratuitamente

      Detalhes

      Informações

      Elevação 110 m

      Previsão do Tempo

      Desenvolvido por AerisWeather

      Hoje

      sábado 11 outubro

      15°C

      11°C

      10 %

      Se você começar sua atividade agora...

      Velocidade máxima do vento: 16,0 km/h

      Mais visitado durante

      Janeiro

      Fevereiro

      Março

      Abril

      Mai

      Junho

      Julho

      Agosto

      Setembro

      Outubro

      Novembro

      Dezembro

      Loading

      Localização:Młodzieszyn, Sochaczew, Voivodia Masoviana, Polónia

      Outros lugares que merecem uma visita

      Explorar
      RotasPlaneador de rotasFuncionalidadesCaminhadasTrilhas de MTBRotas de ciclismo de estradaBikepacking
      Baixe o aplicativo
      Siga-nos nas Redes Sociais

      © komoot GmbH

      Política de Privacidade