Rotas

Planejador

Funcionalidades

Atualizações

App

Entrar ou Criar conta

Baixe o App

Entrar ou Criar conta

Explorar
Places to see

Castles

República Checa
Noroeste
Ústecký kraj

Ponte Tyrš em Děčín

Destaque • Ponte

Ponte Tyrš em Děčín

Recomendado por 78 ciclistas de estrada de 86

Este Destaque está localizado numa área protegida

Consulta os regulamentos locais: CHKO České středohoří

Guardar

Partilhar

  • Mais

  • Guardar

    Partilhar

  • Mais

  • Indicações para chegar lá

    Rotas aqui

    Os melhores Percursos de ciclismo de estrada para Ponte Tyrš em Děčín

    4,8

    (5)

    118

    ciclistas

    1. Circuito Nebočadský Luh – Mariánský Most (Marienbrücke) (ponto de partida: Ústí nad Labem sever)

    50,2km

    02:00

    200m

    200m

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. Superfícies pavimentadas e adequadas para bicicletas.

    Navegar

    Enviar para o telemóvel

    Moderada

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. Superfícies pavimentadas e adequadas para bicicletas.

    Moderada

    Percurso de ciclismo de estrada moderado. É necessário estar em boa forma. Superfícies pavimentadas e adequadas para bicicletas.

    Moderada

    Sugestões

    4 de novembro de 2021

    Nice city with the bridge over the Elbe.

    Traduzido por Google •

      15 de maio de 2018

      Here the cycle path changes the Elbseite. Interesting old bridge with beautiful view.

      Traduzido por Google •

        Proper name would be Tyrš Bridge

        About history:
        The iron bridge with 70 thousand rivets replaced Empress Elisabeth's chain bridge in 1993. This chain bridge was built in 1855 because Děčín urgently needed a reliable connection with Bodenbach on the left bank, which led to the railway line from Prague to Dresden (completed in 1855). With the arrival of automobile traffic, the Chain Bridge was no longer sufficient in terms of technology and capacity. For economic reasons, a variant was chosen during the reconstruction, in which the chain construction was replaced by a modern iron construction on the modified piers of the original bridge. The joint-stock company Škodovy závody in Plzeň won the construction contract in a public competition. The construction was carried out more or less without disruption to traffic. The actual relocation to the final position took place on December 9, 1933. Traffic was stopped at 8 a.m. and the bridge was moved and set within four hours with the help of winds in a frost of -16°C. The bridge was officially opened and put into operation on the same day. She was named after Děčín citizen Dr. Called Miroslav Tyrš. At the time of its opening, the bridge was the largest of its kind in Czechoslovakia.

        Source: idecin.cz/de/die-brucken

        Traduzido por Google •

          Tens uma sugestão valiosa? Inicia sessão e partilha-a com os outros amantes de aventuras!

          Regista-te gratuitamente

          Detalhes

          Informações

          Elevação 140 m

          Previsão do Tempo

          Desenvolvido por AerisWeather

          Hoje

          sexta-feira 7 novembro

          11°C

          6°C

          0 %

          Se você começar sua atividade agora...

          Velocidade máxima do vento: 18,0 km/h

          Mais visitado durante

          Janeiro

          Fevereiro

          Março

          Abril

          Mai

          Junho

          Julho

          Agosto

          Setembro

          Outubro

          Novembro

          Dezembro

          Loading

          Localização:Ústecký kraj, Noroeste, República Checa

          Outros lugares que merecem uma visita

          Elbe Cycle Path: Ústí nad Labem to Děčín

          Explorar
          RotasPlaneador de rotasFuncionalidadesCaminhadasTrilhas de MTBRotas de ciclismo de estradaBikepacking
          Baixe o aplicativo
          Siga-nos nas Redes Sociais

          © komoot GmbH

          Política de Privacidade