Rotas

Planejador

Recursos

Atualizações

App

Entrar ou Criar conta

Baixe o App

Entrar ou Criar conta

Explorar
Places to see
Sérvia
Vojvodina

Ponte Žeželj

Destaque • Ponte

Ponte Žeželj

Recomendado por 9 ciclistas de estrada

Salvar

Compartilhar

  • Mais

  • Salvar

    Compartilhar

  • Mais

  • Traçar rota até esse ponto

    Rotas aqui

    As melhores rotas de ciclismo de estrada até Ponte Žeželj

    4,0

    (6)

    156

    ciclistas

    1. Circuito Ponte Varadin e Ponte Žeželj (ponto de partida: Петроварадин)

    76,4km

    03:12

    130m

    130m

    Percurso de ciclismo de estrada moderado. Requer bom preparo físico. O Percurso pode conter trechos não pavimentados, difíceis para bicicleta.

    Navegar

    Enviar para o celular

    Moderado

    Percurso de ciclismo de estrada moderado. Requer bom preparo físico. Terreno majoritariamente pavimentado e adequado para bicicletas.

    Moderado

    Percurso de ciclismo de estrada moderado. Requer bom preparo físico. Terreno majoritariamente pavimentado e adequado para bicicletas.

    Moderado

    Dicas

    3 de agosto de 2021

    The original Zhezel Bridge (377 meters long) was over an arch bridge built between 1957 and 1961. It was designed by the eminent Yugoslav civil engineer Branko Zhezel and was constructed by Mostogradnja. It connected the urban area of ​​Novi Sad and Petrovaradin. During its existence, it served as part of an international railway line and as a transit route through Novi Sad.

    Original bridge damaged in 1999 (before complete destruction a few days later)
    During the NATO bombing of Yugoslavia, the bridge was bombed 12 times. On 23 April 1999, it was finally destroyed, disrupting rail transport between Belgrade and Subotica, ie [3]. During the NATO bombing, all three major bridges over the Danube in Novi Sad (Zhezel Bridge, Varadin Bridge and the Freedom Bridge) were completely destroyed.


    In 2000, a temporary Road-Railway Bridge was built near Zhezhel Bridge to serve as a replacement for Zhezhel Bridge until a new one was built. Over the years, the construction of the new Zhezel Bridge has been postponed several times.

    Construction work on the new bridge on the same site officially began in April 2012. The main designer of the new bridge was Alexander Bojovic, and the contractor was an international consortium, JV Azvi - Taddei - Horta Coslada. The new bridge is visually similar to the destroyed bridge, except that the arches are made of steel and not prestressed concrete. The bridge consists of two arches, the larger being 219 meters (719 feet) long and 42 meters (138 feet) high, and the smaller 177 meters (581 feet) long and 34 meters (112 feet) high. 7]

    In October 2017, the arches of Zhezel Bridge were connected after five years of construction and eighteen years after the demolition of the previous bridge. As of October 2017, the construction works amounted to EUR 51.71 million. The bridge was completed in April 2018 and regular rail transport was established. The transit of the vehicle was established on September 1, 2018. Encyclopedia site: bg.wikiqube.net

      Tem uma dica legal? Faça login e compartilhe-a com outras pessoas!

      Criar conta grátis

      Detalhes

      Informações

      Elevação 130 m

      Previsão do Tempo

      Desenvolvido por AerisWeather

      Hoje

      terça-feira 21 outubro

      19°C

      10°C

      0 %

      Se você começar sua atividade agora...

      Velocidade máxima do vento: 16,0 km/h

      Mais visitado durante

      Janeiro

      Fevereiro

      Março

      Abril

      Mai

      Junho

      Julho

      Agosto

      Setembro

      Outubro

      Novembro

      Dezembro

      Outros lugares populares

      Beli Majdan Cave

      Explorar
      RotasPlanejador de rotasRecursosTrilhasTrilhas de MTBRotas de ciclismo de estradaBikepacking
      Baixe o aplicativo
      Siga-nos nas Redes Sociais

      © komoot GmbH

      Política de privacidade