Routes

Planner

Kenmerken

Updates

App

Inloggen of Aanmelden

Download de App

Inloggen of Aanmelden

Inspiratie
Bezienswaardigheden
Servië
Vojvodina

Žeželjbrug

Hoogtepunt • Brug

Žeželjbrug

Aanbevolen door 9 wielrenners

Opslaan

Delen

  • Meer

  • Opslaan

    Delen

  • Meer

  • Breng me hierheen

    Routes hier

    Beste wielrenroutes naar Žeželjbrug

    4,0

    (6)

    167

    fietsers

    1. Varadinbrug – Žeželjbrug rondtocht vanuit Петроварадин

    76,1km

    03:13

    130m

    130m

    Gemiddelde racefietsrit. Goede conditie vereist. Delen van de Tour kunnen onverhard en moeilijk begaanbaar zijn.

    Navigeren

    Naar telefoon sturen

    Gemiddeld

    Gemiddelde racefietsrit. Goede conditie vereist. Voornamelijk goed geplaveide ondergrond en makkelijk begaanbaar.

    Gemiddeld

    Gemiddelde racefietsrit. Goede conditie vereist. Voornamelijk goed geplaveide ondergrond en makkelijk begaanbaar.

    Gemiddeld

    Tips

    3 augustus 2021

    The original Zhezel Bridge (377 meters long) was over an arch bridge built between 1957 and 1961. It was designed by the eminent Yugoslav civil engineer Branko Zhezel and was constructed by Mostogradnja. It connected the urban area of ​​Novi Sad and Petrovaradin. During its existence, it served as part of an international railway line and as a transit route through Novi Sad.

    Original bridge damaged in 1999 (before complete destruction a few days later)
    During the NATO bombing of Yugoslavia, the bridge was bombed 12 times. On 23 April 1999, it was finally destroyed, disrupting rail transport between Belgrade and Subotica, ie [3]. During the NATO bombing, all three major bridges over the Danube in Novi Sad (Zhezel Bridge, Varadin Bridge and the Freedom Bridge) were completely destroyed.


    In 2000, a temporary Road-Railway Bridge was built near Zhezhel Bridge to serve as a replacement for Zhezhel Bridge until a new one was built. Over the years, the construction of the new Zhezel Bridge has been postponed several times.

    Construction work on the new bridge on the same site officially began in April 2012. The main designer of the new bridge was Alexander Bojovic, and the contractor was an international consortium, JV Azvi - Taddei - Horta Coslada. The new bridge is visually similar to the destroyed bridge, except that the arches are made of steel and not prestressed concrete. The bridge consists of two arches, the larger being 219 meters (719 feet) long and 42 meters (138 feet) high, and the smaller 177 meters (581 feet) long and 34 meters (112 feet) high. 7]

    In October 2017, the arches of Zhezel Bridge were connected after five years of construction and eighteen years after the demolition of the previous bridge. As of October 2017, the construction works amounted to EUR 51.71 million. The bridge was completed in April 2018 and regular rail transport was established. The transit of the vehicle was established on September 1, 2018. Encyclopedia site: bg.wikiqube.net

      Goed op de hoogte? Log in om een tip voor andere avonturiers toe te voegen!

      Meld je gratis aan

      Details

      Informatie

      Hoogte 130 m

      Weer

      Aangedreven door Foreca

      woensdag 17 december

      8°C

      0°C

      0 %

      Aanvullende weer tips

      Max. windsnelheid: 6,0 km/h

      Meest bezocht tijdens

      januari

      februari

      maart

      april

      mei

      juni

      juli

      augustus

      september

      oktober

      november

      december

      Loading

      Locatie: Vojvodina, Servië

      Andere populaire plekken om te bezoeken

      Beli Majdan Cave

      Verkennen
      RoutesRouteplannerFeaturesWandelroutesMTB TrailsWielrenroutesBikepacking
      Download de app
      Volg ons op Socials

      © komoot GmbH

      Privacybeleid