경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
이탈리아
프리울리 베네치아 줄리아
우디네
아퀼레이아

알프스-아드리아 구 철도 노선 체르비냐노-벨베데레

디스커버
Places to see
이탈리아
프리울리 베네치아 줄리아
우디네
아퀼레이아

알프스-아드리아 구 철도 노선 체르비냐노-벨베데레

하이라이트 (구간) • 자전거 도로

알프스-아드리아 구 철도 노선 체르비냐노-벨베데레

55명 중 51명이 추천함

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    10월 27, 2024

    Many recognize the Italian section of the Alpe Adria Cycle Route as passages along old railways. But few recognize that the last section towards Grado also runs on the bed of an abandoned railway: The Cervigno - Belvedere. The section of this railway is very short and the line was built by the Imperial Royal Friulian Railway Company (in German Friauler Eisenbahn Gesellschaft, FEG).
    The railway line was designed by engineers Giulio Dreossi and Giacomo Antonelli. In the initial plans, the railway should have extended to Grado but due to the war events of the First World War, this extension was never built. The terminal station should have been built at the Mosconi head, before the mobile bridge that exists today (opened in 1935 together with the road embankment built in that year).


    The Habsburg government granted the concession for the construction of the line to the railway company in 1909.

    The railway was officially opened for operation on 16 July 1910 without any popular or private celebrations. The inaugural train consisted of 3 carriages and all passengers waved the Austrian flag from the windows. Arriving at the Belvedere station, the locomotive's "celebratory" whistle frightened the inhabitants and some fled into the surrounding countryside.

    Passenger and freight traffic was originally operated by the Imperial Royal Austrian State Railways (k.k.St.B.) with trains coming from the main towns of the Austro-Hungarian Empire.

    Following the Italian occupation of the Isonzo sector at the beginning of the First World War, in May 1915 the line was transferred to the provisional management of the Società Veneta. With the Treaty of Saint Germain en Laye, the line became part of Italian territory. In 1920, the Ferrovie dello Stato acquired the operation directly, while ownership of the line was maintained by the FEG, whose capital was in the hands of individuals who had become Italian citizens.

    In 1921, the Unknown Soldier train departed from the third track of the Aquileia station for Rome.

    Service on the line was discontinued on 1 July 1937, because the inauguration of the road bridge to Grado had benefited road traffic.

    The railway was reopened in 1942, following fuel restrictions that made replacement bus services inconvenient. However, the line was limited to Belvedere and the Pontile passenger building and its second track were removed.

    The line was officially closed with the timetable change in January 1965.

    번역자 Google •

      10월 28, 2024

      Nice bike post for grade

      번역자 Google •

        나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

        무료 회원 가입

        세부정보

        정보

        거리 8.85 km

        오르막 0 m

        내리막 0 m

        날씨

        Foreca 제공

        오늘

        수요일 3 12월

        11°C

        9°C

        100 %

        지금 활동을 시작하면...

        최고 풍속: 1.0 km/h

        가장 많이 방문한 시기

        1월

        2월

        3월

        4월

        5월

        6월

        7월

        8월

        9월

        10월

        11월

        12월

        Loading

        위치:아퀼레이아, 우디네, 프리울리 베네치아 줄리아, 이탈리아

        살펴봐야 할 유명한 장소

        Roman Forum of Aquileia

        탐험하기
        ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
        앱 다운로드
        소셜 미디어에서 팔로우하기

        © komoot GmbH

        개인 정보 보호 정책