A cable-stayed bridge connecting Zhuhai with Qi’Ao Island. Completed in 1998 it provides two car lanes, a bike lane and pedestrian path in both directions.
The bike lane is street level and not physically separated, allowing for speedy riding across the bridge - and on to Qi’Ao Village, or a loop around the village.