경로

플래너

기능

업데이트

App

로그인 또는 가입

앱 다운로드

로그인 또는 가입

디스커버
Places to see
독일
작센-안할트
안할트 데사우 비텐베르크
안할트 비터펠트
조르비그

자프트반 철도 노선

하이라이트 • 구조물

자프트반 철도 노선

산악자전거 라이더 %lu명 9명이 추천

저장

공유

  • 더보기

  • 저장

    공유

  • 더보기

  • 목적지로 설정

    여기 경로

    최고의 자프트반 철도 노선 산악자전거 라이딩 경로

    5.0

    (1)

    4

    자전거 타는 사람

    1. Löberitz에서 출발하는 페겔투름 그로서어 괴이츠제호 – 그로서어 괴이츠제 호수 마리나 순환 코스

    49.8km

    02:47

    120m

    120m

    보통 산악 자전거 타기. 좋은 체력 필요. 뛰어난 라이딩 실력이 필요함.

    탐색하기

    휴대폰으로 전송

    보통

    보통 산악 자전거 타기. 좋은 체력 필요. 뛰어난 라이딩 실력이 필요함.

    보통

    보통 산악 자전거 타기. 좋은 체력 필요. 뛰어난 라이딩 실력이 필요함.

    보통

    10월 8, 2023

    It was planned as early as 1882 to build a railway line between Bitterfeld via Zörbig to Stumsdorf. In 1884 the Prussian state parliament approved the construction of this route. But it was only when a narrow-gauge railway between Köthen and Zörbig via Radegast was planned in 1894 that the project was pursued further, and the city of Zörbig finally agreed to contribute financially in 1896. The route was opened to traffic on October 1, 1897. In 1910, the narrow-gauge Dessau-Radegast-Köthener Railway (DRKE) line to Radegast, which connected in Zörbig, was expanded to three tracks in order to better connect the Radegast sugar factory. The route was well-used due to rush hour traffic to Bitterfeld and traffic to the lignite and chemical districts. But agricultural products were also transported on it. It was popularly known as the “Juice Railway” because of the sugar beet syrup that was transported on it.
    Branch of the siding to the Verbio bioethanol plant in Zörbig


    In 1944, eight pairs of trains ran along the entire route on weekdays, as well as trains on certain sections of the route. In 1990 there were twelve pairs of trains on the entire route on weekdays. With the decline of Bitterfeld's industry after 1990, traffic also fell rapidly. Freight traffic was stopped on December 31, 1995. The last passenger train ran on September 28, 2002. The route was put out to tender for takeover, but the takeover conditions were not acceptable to those interested. On August 1, 2004, the line between Antonie pit and Stumsdorf was closed. However, the situation changed with the commissioning of a bioethanol plant in Zörbig. The city of Zörbig founded the Zörbiger Infrastructure Company mbH (ZIG). On January 1, 2005, it took over the route between the Antonie pit and Stumsdorf from DB Netz on a 20-year lease. On August 11th, the new company's first freight train ran between Zörbig and Bitterfeld

    번역자 Google •

      나만 알고 있는 정보가 있다면 로그인하여 다른 모험가에게 도움이 될 만한 팁을 추가해보세요!

      무료 회원 가입

      세부정보

      정보

      고도 90 m

      날씨

      Foreca 제공

      토요일 13 12월

      7°C

      2°C

      -- %

      지금 활동을 시작하면...

      최고 풍속: -- km/h

      가장 많이 방문한 시기

      1월

      2월

      3월

      4월

      5월

      6월

      7월

      8월

      9월

      10월

      11월

      12월

      Loading

      위치:조르비그, 안할트 비터펠트, 안할트 데사우 비텐베르크, 작센-안할트, 독일

      살펴봐야 할 유명한 장소

      Landschaftssee Köckern

      탐험하기
      ルート경로 플래너기능하이킹MTB 트레일로드 사이클링 경로바이크패킹
      앱 다운로드
      소셜 미디어에서 팔로우하기

      © komoot GmbH

      개인 정보 보호 정책